Cycle Time and Cost Reduction of Ball Turning Operation of Cardan Shaft

Abstract

The previous productivity of CNC used for ball turning was comparatively lesser which caused the use of running load on next operation that is Slot milling and thereby reducing its Overall Equipment Efficiency (OEE). Here we found the scope of improvisation in order to reduce the cycle time to increase the productivity. Previously insert of 0.8 mm radius was used which was later replaced by insert of 1.2 mm radius and also the number of strokes required to turn the ball were reduced to 2 from 3 reducing the cycle time from 30 seconds to 21 seconds.

Authors and Affiliations

Ishwar Nikam

Keywords

Related Articles

Experimental Investigation of the Performance of the WCDMA Link Based on Monte Carlo Simulation Using Vector Signal Transceiver VST 5644

WCDMA is wideband digital cellular technology used for third Generation (3G) cellular communication. This paper evaluates experimentally the performance of wideband code division multiple access (WCDMA) by using the Mont...

Development of Wireless Sensor Network for Water Level Monitoring in Agricultural Land

The Development of wireless sensor network technology allows us to develop a system for real time environmental monitoring. In the current scenario wireless sensor networks participates a lot in precision agriculture. Th...

Full Authority Digital Engine Control (FADEC)

Full Authority Digital Engine Control (FADEC) Systems is a system consisting of a digital computer and ancillary components that control an aircraft’s engine and propeller. The system consists of a digital computer, call...

Acetylsalicylic Acid and Oral Surgical Procedure

Introduction: Acetylsalicylic acid (ASA) therapy, an antithrombotic agents used in various medical conditions, was frequently discontinued before undertaking any oral surgical procedure. However recent researches advise...

Alphabets, Numbers, Punctuation profess Micro Graph Theory

Seemingly trivial circumstances sometimes give birth to great ideas. In most sciences, one generation tears down what another has built and what one has established another undoes. In Mathematics alone, each generation b...

Download PDF file
  • EP ID EP245317
  • DOI -
  • Views 114
  • Downloads 0

How To Cite

Ishwar Nikam (2017). Cycle Time and Cost Reduction of Ball Turning Operation of Cardan Shaft. International journal of Emerging Trends in Science and Technology, 4(4), 5118-5121. https://europub.co.uk/articles/-A-245317