Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 11

Abstract

Objective During the evolution of existing DCS (data communication subsystem) towards a dual-mode four-network system in the major signaling system renovation project of Shanghai Rail Transit Line 3 and Line 4, there is a hidden risk that the trackside DCS single-point fault may cause the failure of individual vehicle-wayside communication network. It is needed to optimize DCS reliability through adjusting the communication network structure. Method Based on TACS (train autonomous circumambulate system) structure and operation context, the DCS network structure is analyzed to identify key nodes and links affecting DCS reliability. The optimization scheme for DCS reliability is elaborated from both device and protocol layers. Field tests of operating trains on a sample section in the optimized scheme are conducted to evaluate the reliability of DCS. Result & Conclusion The optimized DCS demonstrates high reliability, it significantly enhances the overall performance of signaling system.

Authors and Affiliations

Xin WANG

Keywords

Related Articles

Study on Fatigue Life Reliability of Vehicle Bogie Arm Positioning Node

Objective Based on the virtual simulation fatigue test technology, fatigue life analysis and reliability evaluation of the bogie arm positioning node of a certain type of vehicle are carried out to improve the vehicle st...

Sparse Total Focus Imaging of Rail Transit Rail Defects Based on Grey Wolf Algorithm

[Objective] Using the ultrasonic phased array technology can realize high-precision imaging detection of rail transit rail defects. However, the widely used FMC-TFM (full matrix capture-total focusing method) has the dis...

Application of Distributed Photovoltaic Power Generation at Urban Rail Transit Station Entrances and Exits

Objective Based on the goals of carbon peak and carbon neutrality in China and the demand for green, low-carbon and sustainable development of urban rail transit, the feasibility of applying distributed photovoltaic powe...

Optimization of ATO Re-benchmarking Method Based on Light Braking Command

Objective When the initial parking of an FAO (fully automatic operation) train in station exceeds the permitted range for door opening, the ATO (automatic train operation) system needs to re-benchmark accurately. The con...

Fire Hazard Analysis and Application in Trains

Objective Fire accidents are major safety hazards in metro operation. To reduce fire hazards to an acceptable level and ensure the safe operation of trains, the research is specifically carried out. Method The safety ana...

Download PDF file
  • EP ID EP751199
  • DOI 10.16037/j.1007-869x.2024.11.026
  • Views 45
  • Downloads 0

How To Cite

Xin WANG (2024). Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4. Urban Mass Transit, 27(11), -. https://europub.co.uk/articles/-A-751199