DEFINITION OF CONDITIONS OF TRANSITION FROM CORRECTIVE RECOVERY TO PLANNED RECOVERY STRATEGY OF UNINTERRUPTIBLE POWER SUPPLY

Abstract

The problem of the conditions definition of the transition from the corrective recovery to the planned recovery strategy of an uninterruptible power supply, while a reliability is kept on the same level, is considered in this paper. We consider the uninterruptible power supplies (UPS), which have a modular structure of the power supply unit (PSU). They are designed as a fault-tolerant systems (FTS) with N+M and 2×(N+M) redundant configurations, where N - is number of the PSU modules required to power the workload, and M - the number of the redundant modules. When there are the specific time intervals where an object, where the UPS is installed, is inaccessible, or there are problems with an access to it, it is reasonable to perform the transition from the corrective recovery (CR) to the planned recovery (PR) strategy of the UPS. In order to perform this, the parameters of the FTS and the recovery strategy must be defined. Those parameters must provide the equivalent UPS's reliability. For the UPS with N+M redundant configuration the CR strategy is applied (UPS № 1). The CR strategy is performing recovery immediately after the finding the fact that UPS reached threshold condition (but can be operable as well). From this moment begins the countdown of recovery procedure. For an UPS with 2×(N+M) redundant configuration the PR strategy is applied (UPS № 2). It differs from the previous one in that the recovery procedure starts at the predetermined scheduled time moments. In these time moments the condition of the UPS is compared with its threshold operable condition and a decision to send a repair crew to the215 object is made. If the condition does not meet the threshold condition, the repair crew is not sent. To solve this problem the models of fault-tolerant systems as the systems of Kolmogorov–Chapman differential equations had been developed. With its help, the dependence of the mean time of a failure-free operation (TFFO) of the UPS № 1 on the duration of the recovery of its components have been determined. For the input data, the periodicity values of the PR (TPER) for the UPS № 2, which provides the equivalent reliability with the UPS №1 by the TFFO index, have been determined. Though, those recovery strategies, while providing the same mean times of a failure-free operation, provide the different values of the probability of a failure for a given operation time.

Authors and Affiliations

Bohdan Volochiy, D. Kuznetsov

Keywords

Related Articles

QUADRATURE DETECTOR SYMBOLIC MODEL

Quadrature detectors (QD) are widely used in a radioelectronic devices as alternative to the synchronous detectors. There are many applications where there is necessary to measure the amplitude of input signal with speci...

METROLOGY TASKS OF AIRPHOTOSHOOTING BY REMOTE-PILOTED VEHICLE

This paper dwells upon the use of remote-piloted vehicles in the airphotoshooting of different areas. There is a need to process images automatically, for example, by searching the overlapping areas for stitching of the...

THE PROCEDURE OF OPTIMIZATION OF LINEAR PERIODICALLY TIME-VARIABLE CIRCUITS IN AN ENVIRONMENT UDF MAOPCs

The paper presents the procedure of optimization of linear periodically time-variable circuits based on the calculation of circuit parametric transfer functions by the frequency symbolic method. The parametric transfer f...

RESEARCH OF THE RADIO CHANNEL PARAMETERS OF LTE NETWORK

To be successful, efficient operation of networks apply the relevant methods of network and systems management, which require constant and reliable metrological provision and receipt of appropriate and effective estimate...

ANALYSIS OF NETWORK TRAFFIC STRUCTURE AND NETWORK ANOMALY DETECTION IN THE LOCAL SEGMENT OF LVIV POLYTECHNIC NATIONAL UNIVERSITY CAMPUS NETWORK

The main objectives of this article are to analyze and propose new solution to increase network efficiency and security. New approaches to the network designs are emerging with changing of network services and network av...

Download PDF file
  • EP ID EP459742
  • DOI -
  • Views 180
  • Downloads 0

How To Cite

Bohdan Volochiy, D. Kuznetsov (2014). DEFINITION OF CONDITIONS OF TRANSITION FROM CORRECTIVE RECOVERY TO PLANNED RECOVERY STRATEGY OF UNINTERRUPTIBLE POWER SUPPLY. Вісник Національного університету "Львівська політехніка", серія "Радіоелектроніка та телекомунікації", 796(2014), 214-221. https://europub.co.uk/articles/-A-459742