DEFINITION OF CONDITIONS OF TRANSITION FROM CORRECTIVE RECOVERY TO PLANNED RECOVERY STRATEGY OF UNINTERRUPTIBLE POWER SUPPLY

Abstract

The problem of the conditions definition of the transition from the corrective recovery to the planned recovery strategy of an uninterruptible power supply, while a reliability is kept on the same level, is considered in this paper. We consider the uninterruptible power supplies (UPS), which have a modular structure of the power supply unit (PSU). They are designed as a fault-tolerant systems (FTS) with N+M and 2×(N+M) redundant configurations, where N - is number of the PSU modules required to power the workload, and M - the number of the redundant modules. When there are the specific time intervals where an object, where the UPS is installed, is inaccessible, or there are problems with an access to it, it is reasonable to perform the transition from the corrective recovery (CR) to the planned recovery (PR) strategy of the UPS. In order to perform this, the parameters of the FTS and the recovery strategy must be defined. Those parameters must provide the equivalent UPS's reliability. For the UPS with N+M redundant configuration the CR strategy is applied (UPS № 1). The CR strategy is performing recovery immediately after the finding the fact that UPS reached threshold condition (but can be operable as well). From this moment begins the countdown of recovery procedure. For an UPS with 2×(N+M) redundant configuration the PR strategy is applied (UPS № 2). It differs from the previous one in that the recovery procedure starts at the predetermined scheduled time moments. In these time moments the condition of the UPS is compared with its threshold operable condition and a decision to send a repair crew to the215 object is made. If the condition does not meet the threshold condition, the repair crew is not sent. To solve this problem the models of fault-tolerant systems as the systems of Kolmogorov–Chapman differential equations had been developed. With its help, the dependence of the mean time of a failure-free operation (TFFO) of the UPS № 1 on the duration of the recovery of its components have been determined. For the input data, the periodicity values of the PR (TPER) for the UPS № 2, which provides the equivalent reliability with the UPS №1 by the TFFO index, have been determined. Though, those recovery strategies, while providing the same mean times of a failure-free operation, provide the different values of the probability of a failure for a given operation time.

Authors and Affiliations

Bohdan Volochiy, D. Kuznetsov

Keywords

Related Articles

ENHANCEMENT OF THE ELECTROMAGNETIC FIELD BY PERIODIC STRUCTURES FOR RAMAN SPECTROSCOPY APPLICATION

Raman spectroscopy is an extremely sensitive and effective method for studying the structure of macromolecules and their changes. The specially designed SERS substrates are one of the ways to enhance Raman signals. Such...

DETERMINATION OF ACCEPTABLE PARAMETERS AREA IN MODIFIED DETECTOR OF QUADRATURE PHASE SHIFT KEYING SIGNALS

This paper describes the Matlab simulation results of receiving signals with quadrature modulation, such as OQPSK, using modified phase detector. As the result, the BER-to-SNR diagrams were presented for modified and cla...

METHOD ENSURING ELECTROMAGNETIC COMPATIBILITY WITH COGNITIVE FREQUENCY RESOURCE ALLOCATION IN A MOBILE COMMUNICATION SYSTEM

Individual elements of systems and networks using radio links, to interfere with other network elements, and in turn, they are subject to interference effects. Designed by many methods, techniques, theoretical studies de...

STAGES OF THE MODERN IT SERVICES DEVELOPMENT AND ENERGY EFFECTIVENESS OF NETWORK TECHNOLOGIES

The article reviews the architectural transformation of modern networks and their (mobile) services and applications. Periods of network services, Internet and cloud computing are posted. We describe the requirements for...

RESEARCH ON QUALITY OF SERVICE PARAMETERS FOR PHOTONIC TRANSPORT NETWORKS

Designing the photonic transport networks is the task of great complexity, because of variety traffic queues should be transmitted with different priorities. Task of dynamic supporting the different quality of service (Q...

Download PDF file
  • EP ID EP459742
  • DOI -
  • Views 165
  • Downloads 0

How To Cite

Bohdan Volochiy, D. Kuznetsov (2014). DEFINITION OF CONDITIONS OF TRANSITION FROM CORRECTIVE RECOVERY TO PLANNED RECOVERY STRATEGY OF UNINTERRUPTIBLE POWER SUPPLY. Вісник Національного університету "Львівська політехніка", серія "Радіоелектроніка та телекомунікації", 796(2014), 214-221. https://europub.co.uk/articles/-A-459742