Delay Analysis of AODV Routing Protocol
Journal Title: International Journal of Research in Computer and Communication Technology - Year 2016, Vol 5, Issue 4
Abstract
MANET is a mobile ad-hoc network. It is an infrastructure less communication network through which we can send the information from source to destination in the form of packets using different routing protocols. There are different type of protocols like AODV (Ad-hoc on demand distance vector), DSR (Dynamic Source Routing) and DSDV (Destination Sequenced Distance Vector).While sending the information from source to destination there are different parameters which have to be considered like delay, packet loss, throughput etc. Out of the three protocols named above AODV is the best routing protocol. In this paper we have discussed about MANET, AODV protocol and improvement in AODV protocol to reduce the delay and packet loss.
Authors and Affiliations
Sagar S. Mahajan, Nikhil S. Rane, Prasad R. Sonawane, Manisha R. Rajput
Secure Fog Computing: Providing Data Security
Fog computing is a term for an alternative to cloud computing that puts some kinds of transactions and resources at the edge of a network, rather than establishing channels for cloud storage and utilization. Proponen...
DISCOVERING OPTIMUM FORWARDER LIST IN MULTICAST WIRELESS SENSOR NETWORK
Routing Protocol design for wireless networks is problem area that has two essential requirements. Minimize energy cost and maximize network throughput. Wireless Sensor Network consists of sensor devices which senso...
Seclusiveness Jamming Attacks Using Packet Hiding Method
We explains the problem of selective jamming attacks in wireless networks. The adversary is active only for a short period of time in this particular attack, it selectively targets the messages of high priority with...
A Novel Technique For Efficient Data Access In MDTN
It is pleasing to offer differentiated access services such thatdata access policies are distinct over user attributes or roles,which are direct by the key authorities. We propose a securedata recovery scheme using C...
Analysis of Multi-dimensional IOT Based Data
Internet of Things (IOT) is a worldwide network that interconnects different objects together. These objects are uniquely addressable via standard communication protocols. IOT that attempts to make the things’ informat...