Delay analysis of multihop wireless ad hoc network using queuing network model

Journal Title: INTERNATIONAL JOURNAL OF COMPUTERS & TECHNOLOGY - Year 2013, Vol 10, Issue 4

Abstract

Ad hoc wireless network is a self configurable infrastructure less network. The lack of infrastructure support in ad hoc networks makes them useful in various applications such as at the disaster site, highway, vast forest, battle field, oceans, etc. Since there is no centralized control in ad hoc network, each node can act as a source, a destination or a router. Ad hoc wireless networks therefore, experience congestion more than the wired networks, leading to jitter and high end to end delays even for moderate traffic which may lead to performance degradation. So it is crucial to analyze the factors which affect the capacity and end-to-end delay in wireless ad-hoc networks. In this paper a G/G/1queuing network model is proposed togain insights into the end-to-end delay in a multi hop wireless ad hoc networks. Queuing network model is unique as it providesclosed form expressions for average end-to-end delay in multihop wireless ad hoc networks. NS2 simulation is conducted in order to verify  and compare the theoretical results.

Authors and Affiliations

Seema Kumari, Dr. M. U. Kharat

Keywords

Related Articles

ANALYSIS OF STUDENT ACTIVITIES ON COMPUTER - A STUDY ON PUNJAB UNIVERSITY, INDIA

The purpose of this research is to investigate and understand how students are using computer. The activities that a student undertakes with the help of computers which might be fulfilling some academic or non academic p...

Back Radiation Suppression in Modified Aperture Coupled Microstrip Antenna by using patches under the substrate

A microstrip slot antenna for C Band has been proposed with compact structure and suppressed back radiation. In this paper, the feeding technique used is aperture coupling with a modification that patches and the feed li...

Mapping between XML and RDF via DTD

XML has gained massive popularity for representation of data in last decades. Both HTML and XML are used as primary data formats since the existence of World Wide Web. As the amount of data is growing, need has emerged t...

Sparsity based Single Object Tracking

Object tracking has importance in various video processing applications like video surveillance, perceptual user interface driver assistance, tracking etc. This paper deals with a new tracking technique that combines the...

A Study on Existing Protocols and Energy-Balanced Routing Protocol for Data Gathering in Wireless Sensor Networks

Energy is an extremely critical resource for battery-powered wireless sensor networks (WSN), thus making energy-efficient protocol design a key challenging problem. Most of the existing energy-efficient routing protocols...

Download PDF file
  • EP ID EP650189
  • DOI 10.24297/ijct.v10i4.3250
  • Views 67
  • Downloads 0

How To Cite

Seema Kumari, Dr. M. U. Kharat (2013). Delay analysis of multihop wireless ad hoc network using queuing network model. INTERNATIONAL JOURNAL OF COMPUTERS & TECHNOLOGY, 10(4), 1503-1509. https://europub.co.uk/articles/-A-650189