Delay Analysis of Pressure Vessels Fabrication using Fuzzy FMEA

Abstract

Every day, development continues to be carried out for various interests that will lead to the goal of improving people's welfare. The project is not only carried out in the field, but there are supporting jobs carried out in other locations such as equipment or certain parts which are usually carried out in workshops or sub-contracted to another company, one of which is pressure vessels. The number of project delays in the world and the manufacturing sector in Indonesia is quite high. In this study, will discuss the delay caused by fabrication, pressure vessel project, which benchmarked the Fabricator in Banten. Brainstorming is used to gather information about potential delays and the Focus Discussion Group (FGD) is used to determine the agreement of the factors that cause delays, Severity value, Occurency and Detection value. Risk Priority Nunber (RPN) obtains the result of the multiplications Severity x Occurency x Detection. 15 factors delay in getting as a cause of delay. More high the value of the RPN, higher the ranking of the causes of delay. In this study Fuzzy FMEA supports FMEA results in several rankings

Authors and Affiliations

Gunanto . , Zulfa Fitri Ikatrinasari

Keywords

Related Articles

A UNIFIED APPROACH FOR GENERALIZED MINIMUM VARIANCE CONTROLLER FOR LINEAR TIME-VARYING SYSTEMS

We study single input and single output stochastic linear time-varying systems and develop a unified approach for generalized minimum variance controllers. The plant to be controlled is a time-varying controlled autoregr...

CFD Simulation of Flow Past Wing Body Junction: A 3-D Approach

Turbulence and flow disturbances occurring at the wing body junction of aircraft causes aerodynamic drag and decreases the performance. The main objective of this work is to modify the design at wing body junction by the...

PREDICTION OF AERODYNAMICCHARACTERISTICS FOR SLENDER BLUFF BODIES WITH DIFFERENT NOSE CONE SHAPES

In this work, the numerical approach is used to verify the aero/hydrodynamic performance of different geometries of nose cones. Computational methods predict the flow characteristics fairly accurately in order to validat...

Experimental Investigation and Optimiztion of Welding Parameters of Metal Inert Gas Welding Process in Joining Dissimilar Metals

The erection and production industries of modern world use dissimilar metals for different parts that are primarily joined using numerous welding processes. Metal Inert Gas welding has a wider application in the manufact...

Characterization of Palmyra Fiber and Polyester Resins Composit

The global demand for wood as a building material is steadily growing, while the availability of this natural resource is diminishing. This situation has led to the development of alternative materials. Composites Some u...

Download PDF file
  • EP ID EP579825
  • DOI 10.24247/ijmperdapr20198
  • Views 105
  • Downloads 0

How To Cite

Gunanto . , Zulfa Fitri Ikatrinasari (2019). Delay Analysis of Pressure Vessels Fabrication using Fuzzy FMEA. International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ), 9(2), 83-90. https://europub.co.uk/articles/-A-579825