Delays Factors for Construction Projects in South of Iraq

Journal Title: Engineering and Technology Journal - Year 2024, Vol 9, Issue 09

Abstract

This study seeks to identify and categorize the factors responsible for delays in construction projects in southern Iraq. Using a sequential research approach that includes a literature review, interviews, and surveys, data were collected from 115 industry professionals, including clients, consultants, project managers, contractors, and engineers. The analysis utilized both descriptive and conclusive statistical methods, with a specific emphasis on the Spearman rank correlation coefficient to verify the reliability of the delay factor rankings. The research identified 45 major delay factors, with the most critical being global and local economic crises, bureaucracy and corruption, public holidays, delays in securing municipal permits, and frequent change orders initiated by clients. These factors were further classified into eight categories: inaccuracies in the tendering process, technical performance management, government interference, rework in construction practices, among others. The results indicate strong consensus among the different respondent groups regarding the main causes of project delays, as demonstrated by high correlation coefficients and a Chi-squared test confirming the agreement's significance. The findings provide valuable insights for practical applications and academic research, supporting the selection of project leaders, anticipating potential delays, and improving project management practices in Iraq. The study suggests future research should focus on strategic economic planning, exploring alternative funding sources, combating corruption, and implementing regulatory reforms to address the identified delay factors.

Authors and Affiliations

Noor Ali Abdulridha , Mawahib A. Gata,

Keywords

Related Articles

Estimation of Solar Power Generation Through the Use of Effective Forecasting Algorithms

The unpredictable nature of solar power generation poses significant challenges to energy management, particularly in power grids with high solar penetration, leading to potential imbalances between supply and demand. Th...

Student's Performance Evaluation Using Ensemble Machine Learning Algorithms

This study explores the critical domain of predicting students' academic performance in educational institutions. By harnessing the potential of machine learning algorithms, specifically Random Forest, KNN, and XGBoost,...

Mobile-Based Marketing Application for Coffee Beans and Ground Coffee at Andatu Store

Andatu Store, located in Danau Rata Village, Kisam Tinggi District, Ogan Komering Ulu Selatan Regency, is a single store that sells coffee beans and ground coffee from various selected types. Andatu Store faces several c...

Estimation of Undrained Shear Strength of Soil from CPTu Data

The estimation of undrained shear strength ( ) from Cone Penetration Test with pore pressure measurement (CPTu) for two sites was investigated in this research. The CPTu cone parameters: net cone resistance ( ), excess p...

A Literature Survey on Demographics and Topic Impacts on the co-spread of Healthcare prediction based on Twitter(X) Data

Big data is being used much more frequently to monitor trends in business, economics, society, and health as a result of more individuals utilizing Twitter and other social media. Businesses utilize sophisticated statist...

Download PDF file
  • EP ID EP744308
  • DOI 10.47191/etj/v9i09.11
  • Views 32
  • Downloads 0

How To Cite

Noor Ali Abdulridha, Mawahib A. Gata, (2024). Delays Factors for Construction Projects in South of Iraq. Engineering and Technology Journal, 9(09), -. https://europub.co.uk/articles/-A-744308