Design and Construction of a 0.75KVA Inverter Power Supply for Nigerian Homes and Offices

Abstract

Over the years, there have been a gradual increase in the electricity generation capacity of Nigeria, with more gas power plants installed between 1999 2003 to augment power supply from the existing hydro and thermal power plants installed in the 1970s but despite gradual increase in Mega Watts MW of electric power generated, Nigerian electricity consumers continue to experience epileptic and unreliable power supply distribution. As at today, the power distribution companies referred to as the DISCOs supply epileptic or skeletal power to their customers which they termed 'load shading’. This term explains a situation whereby a power consumer or customer can obtain a power ration for some hours in the day and do not have power remaining hours in the day. Because of this, many consumers depend on generating sets as alternative source of power. This is inefficient and costly to maintain. Today it is possible to introduce the electric power inverter which converts battery DC voltage to AC voltage. Inside the inverter can be coupled an electric charging system which can charge the battery when there is power supply from utility power source. When this power source fails, the battery in turn supplies the inverter with DC which is being converted to A.C sometimes the inverter can also be connected to renewable energy source like solar, wind etc. These sources ensures an all round supply of DC for the inverter. Renewable energy can be particularly suitable for developing countries such as Nigeria where public power supply is totally unreliable. In response to the yearning of the majority of Nigerians for a steady power supply, this research paper tries to contribute in a little way by designing and constructing a 0.75KVA inverter to power homes and offices. The paper starts by defining what an inverter is, reviewed similar past works in literature, and it explained the principles of operation and components used with its circuit diagram. The completed work was tested and met its design specifications. Lois O. Nwobodo | Nkemdilim Ifeyinwa Obiokafor | Samuel C. Asogwa | Fidelis C. Obodoeze "Design and Construction of a 0.75KVA Inverter Power Supply for Nigerian Homes and Offices" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-2 , February 2021, URL: https://www.ijtsrd.com/papers/ijtsrd38533.pdf Paper Url: https://www.ijtsrd.com/engineering/electrical-engineering/38533/design-and-construction-of-a-075kva-inverter-power-supply-for-nigerian-homes-and-offices/lois-o-nwobodo

Authors and Affiliations

Lois O. Nwobodo | Nkemdilim Ifeyinwa Obiokafor | Samuel C. Asogwa | Fidelis C. Obodoeze

Keywords

Related Articles

Problems and Reforms of Secondary Capital Market in India

Capital Market is vital for the growth and development of an economy. Now-a-days individual investors, mutual funds, pension funds and insurance funds place their money in various instruments of capital market. Therefore...

Developing the Scientific Temperament in the Children at Early Schooling Age

Teaching learning process is the most important pillar of any school which defines the academic success of the school. Monotonous ways of completion of syllabus and homework leads the majority of the students taking the...

East India Company Origin and Impact

Between early 1600s and the mid-19th century, the British East India Company lead the establishment and expansion of international trade to Asia and subsequently leading to economic and political domination of the entire...

A Critical Appraisal on Shleepada in Ayurveda

Shleepada is Kapha Pradhana Tridoshaja Vyadhi which manifests by vitiating Mamsa, Kapha and Rakta and it leads to abnormal enlargement of different body parts. Dusta Jala is considered to be one of the prime causes of Sh...

Earned Value Management for Design and Construction Project

In most of the construction projects it has been notice that certain causes may lead to delay in construction activities. This will make timeschedule and costbudget overrun in the project. Thus, it has become a major and...

Download PDF file
  • EP ID EP693957
  • DOI -
  • Views 137
  • Downloads 0

How To Cite

Lois O. Nwobodo, Nkemdilim Ifeyinwa Obiokafor, Samuel C. Asogwa (2021). Design and Construction of a 0.75KVA Inverter Power Supply for Nigerian Homes and Offices. International Journal of Trend in Scientific Research and Development, 5(2), -. https://europub.co.uk/articles/-A-693957