Design and Experimental Verification of Urban Rail Transit Flexible Formation Train Reconnection Functionality

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8

Abstract

Objective During off-peak hours, large train departure interval is adopted for off-peak urban rail transit passenger flow, however, it is commonly faced with issues of low seat occupancy rates and high energy consumption. To enhance the operational service level of urban rail transit, it is necessary to conduct in-depth research on flexible formation train reconnection functionality. Method Based on the development situation of flexible train operation mode in urban rail transit in China, referring to some concepts from high-speed railway EMU (electric multiple units), the main design contents of flexible formation train reconnection are elaborated from aspects of coupler reconnection, vehicle hard-wired circuit reconnection, TCMS (train control and monitoring system) reconnection, and train signal interface requirements. Additionally, the primary verification contents of flexible train formation are introduced from two dimensions: vehicle reconnection form tests and vehicle reconnection routine tests. Result & Conclusion The operation plan of 3-car or 3+3 car train formations on Shanghai Rail Transit Line 16, tailored to peak and off-peak passenger flow demands, can achieve train coupling or decoupling within 3 minutes, which demonstrates the feasibility of the proposed plan.

Authors and Affiliations

Chengpeng CAO, Haifeng CAO, Zhenliang FU, Chunwei CAO, Mingyuan HAO

Keywords

Related Articles

Reflections on Several Digital Transformation Issues of Urban Rail Transit

Objective Urban rail transit digital transformation has become the future development trend of the industry. Different from the digital transformation of the manufacturing industry, as a large-scale operation service sys...

Cause Analysis and Rectification Measures of Chongqing Rail Transit Line 1 Low-frequency Train Oscillation

Objective To address the issue of low-frequency train oscillation on Chongqing Rail Transit Line 1 (hereinafter as ′Line 1′), it is necessary to analyze the causes of the oscillation and formulate appropriate rectificati...

Data-driven Prediction Method for High-speed Railway EMU Train Front and Rear Car Wheel Tread Defects

Objective Tread defects are a primary manifestation of wheel failures in high-speed railway EMU (electrical multiple unites) trains, significantly impacting both EMU train operation safety and passenger ride comfort. Whe...

Study on Flow Plasticity and Permeability of Mixture Conditioned Muck for Metro Shield Tunnel in Water-rich Sand Stratum

[Objective] When tunnel boring machine advancing in the water-rich sand layer, problems such as high cutter torque, serious wear and spout of the screw conveyer can be easily generated. In order to ensure the safety of c...

Statistical Analysis of Beijing Subway Thin-walled Diaphragm Wall Foundation Pit Deformation Law

Objective The thickness of diaphragm walls significantly affects the amount and mode of foundation pit deformation, thin-walled diaphragm walls are especially sensitive to excavation and edge loads of foundation pit. The...

Download PDF file
  • EP ID EP742729
  • DOI 10.16037/j.1007-869x.2024.08.058
  • Views 11
  • Downloads 0

How To Cite

Chengpeng CAO, Haifeng CAO, Zhenliang FU, Chunwei CAO, Mingyuan HAO (2024). Design and Experimental Verification of Urban Rail Transit Flexible Formation Train Reconnection Functionality. Urban Mass Transit, 27(8), -. https://europub.co.uk/articles/-A-742729