Design Integrating & Process in Engineering to Reduce Production Cycle Time In Development of Product

Abstract

Product development teams employ much method’s and tool’s as they design, test, and manufacturing a new (or improve) product. It is important that the product development team understand how their design and decisions affect manufacture system performances. Having this feedback early in the design processes avoids rework loop’s needed to solve problems of manufacturing capacity or cycle time. The team can incorporate this information and associated costs into a design decision problem aimed at choosing the best possible product design. It is clear that the product design, which requires a specific set of manufacturing operations, has a huge impact on the manufacturing cycle time. Reducing manufacturing cycle time has many benefits, including but not limited to lower inventory, reduced costs, improved product quality, faster response to customer orders, increased flexibility and a reduced time-to-market. Design for Production (DFP) refers to methods that evaluate a product design by comparing its manufacturing requirements to available capacity and estimating manufacturing cycle time. DFP can be used to design the product in a way that decreases required capacity, reduces the manufacturing cycle time, or otherwise simplifies production. To understand how a product design impacts manufacturing system performance, this research develops analytical (not simulation) models to quantify how introducing a new product increases congestion in the manufacturing system. It presents approaches that use this information intelligently and make suggestions on product redesign and manufacturing system improvements.

Authors and Affiliations

Mahesh Mallampati, Dr. Kolla Srivinivas, Dr. Mohammad Altamush Siddiqui

Keywords

Related Articles

Performa-nce Prediction of a Jatropha-Biodiesel Powered Gas Turbine Plant

This paper examines the behaviour of a 75MW gas turbine plant fired with Jatropha biodiesel derived from Nigerian feedstock as a possible alternative fuel. The analysis was carried out by varying the ambient temperature...

“Experimental Study on Fly Ash based Geopolymer Concrete with Replacement of Sand by GBS”

The objective of this research work was to produce a carbon dioxide emission free cementitious material. The geopolymer concrete is totally cement free concrete. In this present study the main limitations of fly ash base...

Use Of Human Ergonomics In Power Harnessing

This paper emphasizes the use of human ergonomics to harness the energy from energy generators such as piezoelectric films placed in chairs and desks where humans would apply certain amount of pressure while carrying out...

Optimisation of Fan Blade Angle

This report represents the optimization of fan blade angle in accordance with the various room temperatures that can be in the tropical area like India. We took this work mainly because cooling is an important factor now...

Wireless Transmission of Electrical Power Overview of Recent Research & Development

The Aim Of This Research Work Is To Give A Overview Of Recent Researches And Development In The Field Of Wireless Power Transmission. The Methods Applied For Wireless Power Transmission Like Induction, Electromagnetic Tr...

Download PDF file
  • EP ID EP392612
  • DOI 10.9790/9622-0710066672.
  • Views 69
  • Downloads 0

How To Cite

Mahesh Mallampati, Dr. Kolla Srivinivas, Dr. Mohammad Altamush Siddiqui (2017). Design Integrating & Process in Engineering to Reduce Production Cycle Time In Development of Product. International Journal of engineering Research and Applications, 7(10), 66-72. https://europub.co.uk/articles/-A-392612