Determination of Optimum Location of Rooftop Telecommunication Tower over Multistory Building under Seismic Loading

Abstract

In the last ten years, the growing trend of telecommunication towers has seen a demanding growth. There have been many competitors among operators that have to enhance network reliability and coverage area. The location of tower is very important because it uses latitudes and longitudes with the specified height of mounted antenna which focus towards the practical necessities of the network. In urban areas, it seems that there is scarcity of land and there is no substitute but to implement roof top towers which satisfies ideal installation conditions with respect to its position and height so that spectrum covers the large area. In this work, the results are obtained in terms of the multistoried building situated in seismic Zone-IV. Staad Pro program is used on the structure which is experiencing seismic forces with telecommunication tower positioned at 5 different placing with respect to square base of tower and optimum location of tower over roof.

Authors and Affiliations

Keywords

Related Articles

Design and Fabrication of Garlic Peeler

Garlic is an important and economical plant. It has many uses in medicinal, culinary and ayurvedic purposes. Garlic peeling is a tedious, time consuming and laborious work. So far, traditional peeling methods are used fo...

Fully Casualized Design: A Brief Literary Review

The term experimental design is characterized by the manner in which the portions are distributed in a given experiment. The completely randomized design is the most commonly used among experimental designs because the p...

Design and Fabrication of Little gourd cutter

Plywood base was used as a platform to place the entire equipment. Stainless steel blade was attached to the shaft of motor of 240V which acts as cutting unit. Stainless steel cylinder with supporting iron rod is used fo...

Three-Parameter Logistic Model (ML3): A Bibliometrics Analysis

In the current scenario of Production Engineering, where analysis tools are applied like indicators of production, control and optimization of productive processes or even in the application of advanced analytical method...

Integrated Waste Management Technology with Focus on the Brazilian Amazon

This study deals with the management of the specific residues of tires, electro-electronics and batteries in a city in the Brazilian Amazon. The goal is to propose sustainable actions for the residues under study and, us...

Download PDF file
  • EP ID EP503797
  • DOI 10.22161/ijaers.6.2.9
  • Views 59
  • Downloads 0

How To Cite

(2019). Determination of Optimum Location of Rooftop Telecommunication Tower over Multistory Building under Seismic Loading. International Journal of Advanced Engineering Research and Science, 6(2), -. https://europub.co.uk/articles/-A-503797