Abstract
The results of a study on the determination of the efficiency of electric power generation by nuclear power plants with VVER-1000 reactors based on the full energy cost methodology are presented. The methodology for determining the effectiveness of technology using this methodology was published earlier. Part 1 defines the total energy costs for the construction of nuclear power plants. The main indicators of the energy intensity of the construction of nuclear power plants with VVER-1000 reactors are determined, among which: the specific energy intensity of the NPP unit construction is 246 GJ / kW provided that the policy of National Bank of Ukraine is invariable, and the average hryvnia inflation is 6% /yr, or it is 140 GJ/kW at the hryvnia rate corresponding to the predicted parity of purchasing power of US dollar. The specific energy intensity of a large nuclear power plant is 220 or 125 GJ/kW for the Same two variants. The obtained results will allow to estimate the NPP energy efficiency by the methodology of determining the total energy costs. In Part 2, calculations will be made on the energy costs for nuclear fuel. Part 3 provides coverage of energy costs for NPP operation for 40 years, the costs of its elimination and the determination of the final efficiency of electricity generation at nuclear power plants. Parts 2 and 3 will be published in the next issue of the collection.
Authors and Affiliations
Victor Bilodid
Assessment of the state of coal industry in the temporarily occupied territories of Donbas
The war with Russia in the Ukrainian Donbas has significantly worsened the situation in domestic coal industry. In the occupied areas of Donbas, the coal industry in fact turned out in a catastrophic state, and the mines...
Modelling of energy coal supply by rank for country’s economy at world market conditions and domestic mining decrease
An economic and mathematical model of thermal coal supply by ranks to the country's economy in the global market environment and under reduction of domestic production capacity. The model is based on flow representation...
The determination of maximum capacities of solar power plants in IPS of Ukraine
The maximum value of the solar power plant (SPP) in the power system depends on the performance reserve and regulating capacity of the automatic frequency and power control (AFPC) system. It is believed that the regulato...
Substantiation of the economic efficiency of load control in power systems with the use of electric heat-generators as consumers-regulators
Based on the analysis of control systems of the diurnal electric-load diagrams in the Integrated Power System of Ukraine, we have drawn a conclusion on the necessity of creating new, more efficient means. We have conside...
Improvement of normative provisions for heat pumps as a mechanism for the implementation of European directives
We consider the currently in force European Directives 2009/28/EC, 2009/125/EC, 2010/30/EC, and 2010/31/EU, Regulations and other normative documents corresponding to them as well as international standards for heat pump...