Determination of the efficiency of electric power production by nuclear power plants using the methodology of full energy costs. Part 1. Energy costs for construction

Journal Title: Проблеми загальної енергетики - Year 2018, Vol 0, Issue 2

Abstract

The results of a study on the determination of the efficiency of electric power generation by nuclear power plants with VVER-1000 reactors based on the full energy cost methodology are presented. The methodology for determining the effectiveness of technology using this methodology was published earlier. Part 1 defines the total energy costs for the construction of nuclear power plants. The main indicators of the energy intensity of the construction of nuclear power plants with VVER-1000 reactors are determined, among which: the specific energy intensity of the NPP unit construction is 246 GJ / kW provided that the policy of National Bank of Ukraine is invariable, and the average hryvnia inflation is 6% /yr, or it is 140 GJ/kW at the hryvnia rate corresponding to the predicted parity of purchasing power of US dollar. The specific energy intensity of a large nuclear power plant is 220 or 125 GJ/kW for the Same two variants. The obtained results will allow to estimate the NPP energy efficiency by the methodology of determining the total energy costs. In Part 2, calculations will be made on the energy costs for nuclear fuel. Part 3 provides coverage of energy costs for NPP operation for 40 years, the costs of its elimination and the determination of the final efficiency of electricity generation at nuclear power plants. Parts 2 and 3 will be published in the next issue of the collection.

Authors and Affiliations

Victor Bilodid

Keywords

Related Articles

Methodological approaches to the selection of mining equipment in the course of modernization of the mine

In Ukraine there is just one way to improve coal production up to the new level – technical re-equipment of the industry. New equipment should operate permanently operate in complicated geological conditions of mines, an...

Analysis of the market mechanisms of regulating greenhouse gas emissions in the world and their consideration in existing models for the forecasting of power industry development

This article provides an overview of the system of trading quotas for greenhouse gas emissions. The current experience shows that, under conditions of a well-implemented system, emission trading can be an efficient, reli...

Determination of the efficiency of electric power production by nuclear power plants using the methodology of full energy costs. Part 2. Energy costs for nuclear fuel

We present the results of determination of the efficiency of electric energy generation by nuclear power plants with WWER-1000 reactors according to the methodology of full energy expenditures. The methodology for determ...

Determination of the optimal conditions of implementing the process of thermochemical recuperation for using the heat of exhaust gases of a gas-turbine plant

The problem of the use of thermal secondary energy resources, being formed in gas-turbine plants working on natural gas, is important from the viewpoint of energy saving. The most efficient way of its solution is connect...

Прогнозування рівнів споживання паливно-енергетичних ресурсів з урахуванням потенціалу енергозбереження при структурних змінах в економіці

Надано методичний підхід та математичну модель прогнозування рівнів кінцевого споживання паливно-енергетичних ресурсів з урахуванням потенціалу енергозбереження при структурних змінах (міжсекторних та внутрішньосекторних...

Download PDF file
  • EP ID EP499042
  • DOI 10.15407/pge2018.02.036
  • Views 48
  • Downloads 0

How To Cite

Victor Bilodid (2018). Determination of the efficiency of electric power production by nuclear power plants using the methodology of full energy costs. Part 1. Energy costs for construction. Проблеми загальної енергетики, 0(2), 36-44. https://europub.co.uk/articles/-A-499042