Determining of Well Drilling Sequence for Investment Analysis using Monte Carlo Simulation in Upstream Oil and Gas Company in East Kalimantan, Indonesia

Journal Title: International Journal of Current Science Research and Review - Year 2024, Vol 7, Issue 06

Abstract

Electrical construction company that experienced in making Well Head Control Panels (WHCP) has difficulties to decide acceptance of investment in WHCP contracts raised with their client in upstream oil and gas company. The difficulty mostly due to uncertainty of client well drilling sequence. The electrical construction company need to financial investment analysis includes material purchasing, shipping, fabrication and delivery of WHCPs need to be done to make sure they make a profit. It is crucial for electrical construction company used correct forecasting method to determine schedule of client’s request. Monte carlo forecasting method is used to predict the well drilling sequence. The well drilling sequence data for 12 months is used to determine 24 months well drilling sequence operation with result 179 wells with normal distribution and 167 wells with triangular distribution.

Authors and Affiliations

Yona Vidya Prestiwi,

Keywords

Related Articles

Project Selection of Indonesian Local Oil and Gas Service Company Using Analytical Hierarchy Process (AHP)

PT Duta Wisesa Servisindo or PT. DWS is a local Indonesian company that offers services in the oil and gas sector. This company was founded in 2015 when world oil prices were falling and used this momentum to invest in a...

Recycling Pesticide Plastic Containers in Indonesia: An Evaluation of Technical, Economic, and Regulatory Impact Feasibility

This study explores the feasibility of recycling pesticide plastic packaging in Indonesia, focusing on technical, economic, and regulatory aspects. Technical feasibility analysis highlights challenges in material composi...

The Relationship between COVID-19 Pandemic and Non-Performing Loan Ratio in Indonesian Conventional Banks

This study examines the relationship between COVID-19 variables (COVID-19 cases and COVID-19 deaths) and the nonperforming loan (NPL) ratio in Indonesian conventional banks from Q1 2017 to Q4 2022. Data from 56 conventio...

Socio-Economic Profile of Dairy Cattle Farmers in the Agropolitan Area of Tulungagung, Indonesia

This study investigates the socio-economic profile of dairy cattle farmers in the agropolitan area of Tulungagung Regency, focusing on smallholder dairy farming in a developing country context. The research aimed to expl...

Dramatization and Theater Performance: An Approach to the Teaching and Learning of English Literature

This case study investigated the integration of drama in English literature teaching in a British literature course for English majors at Ho Chi Minh City Open University. It attempted to explore the underlying teaching...

Download PDF file
  • EP ID EP736626
  • DOI 10.47191/ijcsrr/V7-i6-23
  • Views 44
  • Downloads 0

How To Cite

Yona Vidya Prestiwi, (2024). Determining of Well Drilling Sequence for Investment Analysis using Monte Carlo Simulation in Upstream Oil and Gas Company in East Kalimantan, Indonesia. International Journal of Current Science Research and Review, 7(06), -. https://europub.co.uk/articles/-A-736626