Development of the comprehensive method to manage risks in projects related to information technologies

Abstract

<p class="a">A comprehensive method of project risk management is proposed for the field of information technologies based on the combined application of intelligent and expert methods under unstable conditions and constraints for financial and time resources. The method makes it possible to support making a decision based on the formalized technique of identification and estimation of risks, as well as the choice of the initial set of measures to avoid a risk event. This method was investigated based on the universal academic example of a project in the field of information technologies. The result of application of the comprehensive method of risk management is an improvement in the efficiency of an IT project by reducing losses in the project and overspending of financial resources.</p><p class="a">Risk model of an IT project based on the Bayesian network is developed, which is the base of the comprehensive method. A risk model of an IT project based on the Bayesian networks makes it possible to study different scenarios of risk occurrence by the simultaneous consideration of different factors in the external environment and internal state in the IT project, as well as their casual relations. The proposed model will make it possible to represent and estimate a risk probability for all possible scenarios and, accordingly, to develop effective measures for risk elimination.</p><p class="a">The proposed structure of the Bayesian network of an IT project risk could become a basis for the information technology of risk management in an IT project and an appropriate decision-making support system.</p>

Authors and Affiliations

Tatiana Prokopenko, Oleg Grigor

Keywords

Related Articles

Development of methodology for modeling the interaction of antagonistic agents in cybersecurity systems

<p>The basic concepts that form the basis of integrated modeling of the behavior of antagonistic agents in cybersecurity systems are identified. It is shown that the emphasis is largely on modeling the behavior of one of...

Construction of the fractional-nonlinear optimization method

<p>A method for solving the fractional nonlinear optimization problem has been proposed. It is shown that numerous inventory management tasks, on the rational allocation of limited resources, on finding the optimal paths...

Development of the technology for obtaining engobed construction articles with the "antiquity" effect

<p>The physical and chemical processes that occur when obtaining engobe coatings for construction ceramics with the decorative "antiquity" effect were considered, the composition of the charge, the technology of manufact...

An integrated website of electronic data interchange and computer-aided process planning in production outsourcing

<p>The assembly industry implements production outsourcing to meet the needs of assembly product components. The outsourcing of assembly product components is based on a relationship model between the contractor and the...

Determining the electromagnetic field parameters to kill flies at livestock facilities

<p>We have considered the electromagnetic method to kill the larvae of flies ‒ agricultural pests. To address the task, a problem on the distribution of electromagnetic fields in their body was solved. The solution is ba...

Download PDF file
  • EP ID EP527864
  • DOI 10.15587/1729-4061.2018.128140
  • Views 60
  • Downloads 0

How To Cite

Tatiana Prokopenko, Oleg Grigor (2018). Development of the comprehensive method to manage risks in projects related to information technologies. Восточно-Европейский журнал передовых технологий, 2(3), 37-43. https://europub.co.uk/articles/-A-527864