Abstract

To manage the various kinds of construction projects, it requires how to deal with organizations. The Project management consultants has characteristic of Knowledge, Performance & Inter-personal Skills. The purpose of this study is to analyze or breakdown various services & role of Project Management Consultants (PMC) and to study the problems faced by PMC during execution the project. Dispute management is an inevitable process in construction project management to reach the desired results successfully. The frequency of dispute is unavoidable due to the nature of the contracts, their complexity, the number of parties involved, the risk and the pressure of time and cost constraint, improper preparation of the contract documents and the realisation of the work. The significantly increasing number of construction disputes indicates the need for the implementation of an effective construction dispute management. This thesis looks into dispute issues in construction projects. This study adopts a comparative approach on dispute management.The problems identified from this thesis is used to determine the factors causing as well as enhancing dispute between project management consultants and civil contractors.

Authors and Affiliations

Dr. K. Divakar, P. Rajanmasilamani

Keywords

Related Articles

A novel household refrigerator with a phase change material (PCM) heat exchanger:An experimental investigation

In this study, a phase change material (PCM) was adopted for constructing heat storage-PCM heat exchanger with a setup based on an ordinary single-door refrigerator.The experimental investigation of the characteristics o...

Laser& Electrical Beam Welding

Both laser welding and electron beam welding produce extremely high-quality joints. Many consider laser welding first, simply because it’s less costly in many circumstances—but not all. Which to choose depends, as always...

Experimental Study of the Geotechnical Behavior of Calcareous Soil Improved using Kaolinite Clay - a Comparative Study

The calcareous soil is commonly composed of calcium carbonates greater than ten percent. Generally, the calcareous soils are extensively found near the coastal areas of Egypt. Accordingly, the performance of calcareous s...

Investigation on Mechanical and Physical Properties of Fly Ash Reinforced Epoxy Resin Composite

Fly ash is an inorganic alumino silicate, a by product of thermal power plant, responsible for air pollution. If we use it as second phase or reinforcement material in composite it will produce a suitable composite mater...

Submerged Floating Tunnel

Submerged Floating Tunnel is a new concept, It is a new type of transport structure. It is very different from other structures like bridges and tunnels, It is the new invention in which the conventional structure in cro...

Download PDF file
  • EP ID EP437930
  • DOI 10.9790/1684-1503035257.
  • Views 54
  • Downloads 0

How To Cite

Dr. K. Divakar, P. Rajanmasilamani (2018). Dispute Management Between Project Management Consultant And Civil Contractor. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 15(3), 52-57. https://europub.co.uk/articles/-A-437930