Earned Value Management for Design and Construction Project

Abstract

In most of the construction projects it has been notice that certain causes may lead to delay in construction activities. This will make timeschedule and costbudget overrun in the project. Thus, it has become a major and challenging problem to complete the project on schedule and within the estimated cost. To solve this problem, the concept of construction project management by Earned Value Management System (EVMS) is evaluated. Earned Value Management (EVM) is a technique that finds the stage at which cost and time overrun; EVM technique acts as an early warning and alarming system for budget and schedule. It not only measures the project performance but also measure the progress of the schedule. In our study we have done Earn Value analysis of a construction project which was completed in the year of 2017, based on project data (BOQ, Actual Budget, and Schedule) and inputs which have been collected we are able to perform EVA by using Microsoft Project. The analysis helps in finding out the deviations both in cost as well as in time i.e. schedule variance and cost variance. It is an effective tool to measure cost, schedule & performance of the project. The EVA is useful in various fields such as IT, Industries and Construction companies etc. This paper summarizes the evolution, basic terminologies of Earned Value Analysis and effective use of it in the construction industries by Microsoft Project. Khalid Mohiuddin Khan | Mr. Masoom Reza"Earned Value Management for Design and Construction Project" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-2 | Issue-5 , August 2018, URL: http://www.ijtsrd.com/papers/ijtsrd17029.pdf http://www.ijtsrd.com/management/other/17029/earned-value-management-for-design-and-construction-project/khalid-mohiuddin-khan

Authors and Affiliations

Keywords

Related Articles

Analysis of Thermal Criteria on Cryogenic Pressure Vessel

"After a cryogenic liquid has been liquefied and purified to the desired level it should then be put away and transported. Cryogenic fluid storage-vessel and transfer line design has progressed rapidly as a result of the...

Using Naive Bayesian Classifier for Predicting Performance of a Student

Data mining techniques play an important role in data analysis. For the construction of a classification model which could predict performance of students, particularly for engineering branches, a decision tree algorithm...

Improving the Performance of PEM Fuel Cell by Varying the Number of Flow Channels

A fuel cell is a device that converts chemical energy into electrical energy, water, and heat through electrochemical reactions. The water formation cause major problem and it affects performance of fuel cell. In PEM fue...

Video Liveness Verification

The ubiquitous and connected nature of camera loaded mobile devices has greatly estimated the value and importance of visual information they capture. Today, sending videos from camera phones uploaded by unknown users is...

Flexural Behaviour of GFRP Bars

Reinforced Cement Concrete (RCC) structures are usually reinforced with steel bars which are subjected to corrosion at critical temperatures and atmospheric conditions. Also the cost of steel reinforcement plays a signif...

Download PDF file
  • EP ID EP389833
  • DOI -
  • Views 59
  • Downloads 0

How To Cite

(2018). Earned Value Management for Design and Construction Project. International Journal of Trend in Scientific Research and Development, 2(5), 1482-1502. https://europub.co.uk/articles/-A-389833