ECONOMIC ANALYSIS OF THE LIFE-CYCLE COST STRUCTURE FOR RAILWAY TRAFFIC CONTROL SYSTEMS

Journal Title: Ekonomicko-manazerske spektrum - Year 2018, Vol 12, Issue 1

Abstract

In the case of complex technical systems that should deliver long life, high availability, safety and reliability, such as railway traffic control systems, the ownership costs many times exceed the costs of its acquisition. Therefore, infrastructure operators in order to make optimal economic decisions, regarding the systems purchase or and modernization, expect that system delivers will give complex information not only about the initial costs of purchasing the system, but also about the costs of its operation and liquidation. It allows to include in budget plans, growing requirements for the reliability availability of infrastructure as well as crucial issue - the traffic safety. Considering the widespread use of railway traffic control systems, which are part of the railway infrastructure, even small savings obtained for individual systems can be resulted into significant financial benefits for infrastructure owners and operators. One of the methods which helps to consider all of the above-mentioned types of costs is the Life Cycle Cost (LCC) analysis. In the case of railway traffic control systems it is a mandatory part of RAMS (Reliability, Availability, Maintainability, Safety) / LCC analysis. Its requirements are defined in the European Union directives, and the methodology is included in the CENELEC standards. The methodology of the LCC analysis, including economic aspects as well as safety and reliability requirements specific to railway traffic control systems was presented by the authors. LCC structure for three various examples of railway traffic control systems were considered. This economic analysis includes level crossing protection system, axle counting system and automatic block signalling. Based on these examples the differences in the LCC structure for individual systems were presented.

Authors and Affiliations

Tomasz Ciszewski, Waldemar Nowakowski

Keywords

Related Articles

THE PROCESSES OF MANAGING HUMAN RESOURCES AND USING MANAGEMENT METHODS AND TECHNIQUES IN MANAGEMENT PRACTICE

All managers have to lead and manage enterprises so that such enterprises achieve maximum profits while generating minimal costs. Each manager is unique and the enterprises’ economic growth mostly depends on his/her char...

THE SEARCH FOR BALANCE AND EQUILIBRIUM OF NEGOTIATING POWERS UNDER DISTORTED MARKET COMPETITION

Free market economy challenges business negotiations due to occasional distortions in market conditions, which impact the balance of negotiating powers. This is most commonly referred to both buyers and sellers. Reducing...

OVERCOMING PARADOX FOR SOCIAL ENTERPRISE DEFINITION: CASE OF LITHUANIA

The study explores dilemma around de jure adopted social enterprise conception and social enterprise universe de facto developing through bottom-up initiatives. The presented analysis of Lithuania case presents sitaution...

PREDICTION MODEL OF FIRM´S FINANCIAL DISTRESS

The issue of classification of firms and the construction of a predictive model of their financial distress has long been in the focus of the attention of economists and scientists in different countries around the world...

INFLUENCE OF STRATEGY FORMULATION DRIVERS ON STRATEGIC PERFORMANCE

To optimize scarce resources firms, need to formulate strategies that will enable them to achieve and sustain competitive advantage. The objective of the study was to propose recommendations to managers of MNCs operating...

Download PDF file
  • EP ID EP592424
  • DOI 10.26552/ems.2018.1.30-43
  • Views 77
  • Downloads 0

How To Cite

Tomasz Ciszewski, Waldemar Nowakowski (2018). ECONOMIC ANALYSIS OF THE LIFE-CYCLE COST STRUCTURE FOR RAILWAY TRAFFIC CONTROL SYSTEMS. Ekonomicko-manazerske spektrum, 12(1), 30-43. https://europub.co.uk/articles/-A-592424