Effective Scheduling of Jobs Using Reallocation of Resources Along With Best Fit Strategy and Priority

Abstract

Grid computing let the devices to distribute the job across different environment, where the resources are heterogeneous in nature. It is a collection of resources from different states in order to attain common goal. Scheduling of jobs is one of the major crises that play a vital role nowadays. So, this paper proposes a scheduling algorithm where the resources can be effectively allocated. Grid Scheduler plays a vital role in allocating the jobs to the resources. Before the job arrives, the function of the Grid Scheduler is to reassemble the memory by its size. When the job arrives, the Shortest Job First algorithm along with the best fit strategy is applied to allocate the job effectively to the resources in order to reduce the wastage of memory. If same sized jobs arrive at the scheduler priority rule is applied to allocate the job. If the job size is not as same as the resource size, at that case the Grid Scheduler locates the resources that are nearby equal to the job size and allocate the resources for that job. The free space that is remaining in those resources is likewise combined with all the free spaces that are remaining in all of the resources, so that these spaces can be combined and used as resource for some other job allocation. The memory wastage is managed at this situation. Here Grid Resource Broker is used for combining all the free memory space. Through this approach scheduling can be performed effectively.

Authors and Affiliations

Jafar Ali Ibrahim. S| Assistant Professor’s, Department of Computer Science & Engineering, Nadar Saraswathi College of Engineering & Technology, Theni- 625531, Tamil Nadu, India, jafartheni@gmail.com, Mohamed Affir. A| Assistant Professor’s, Department of Computer Science & Engineering, Nadar Saraswathi College of Engineering & Technology, Theni- 625531, Tamil Nadu, India, md.affir@gmail.com

Keywords

Related Articles

We introduce the Contributory Broadcast Encryption (ConBE) primitive, which is a half and half of GKA and BE. Contrasted with its preparatory Asiacrypt, this gives complete security proofs, outlines the need of the a...

A Novel System for Scalable Data Sharing in Cloud Storage using Key-Aggregate

Of late, rapid growth observed in the cloud technology. Data sharing is an essential functionality in cloud storage. In this paper, we show how to efficiently, securely and flexibly share data with others in cloud sto...

We propose a framework, in particular, Path Planning by Caching (PPC), to answer another way arranging inquiry continuously by effectively reserving and reusing authentic questioned ways. Not at all like the regular...

Impact of EGR On The Exhaust Gas Temperature And Exhaust Darkness In Pressure Ignition Motors

In diesel motors, NOx arrangement is an exceedingly temperature-subordinate wonder and happens when the temperature in the ignition chamber surpasses 2000 K. Along these lines, with a specific end goal to lessen NOx...

Damping Power System Oscillations Controlled By Using STATCOM

This paper manages the plan of a versatile power oscillation damping (POD) controller for a static synchronous compensator (STATCOM) outfitted with vitality stockpiling. This is accomplished utilizing a flag estimati...

Download PDF file
  • EP ID EP16262
  • DOI -
  • Views 440
  • Downloads 19

How To Cite

Jafar Ali Ibrahim. S, Mohamed Affir. A (2014). Effective Scheduling of Jobs Using Reallocation of Resources Along With Best Fit Strategy and Priority. International Journal of Science Engineering and Advance Technology, 2(2), 87-91. https://europub.co.uk/articles/-A-16262