Empirical Analysis of the Relationship between Project Delivery Method on Project Performance in the Yemen Construction Industry

Abstract

This empirical paper analyzed the relationship between project delivery methods on project performance within the Yemen construction industry (YCI). This research incorporated two distinct project delivery methods (PDM) namely the traditional Design-Bid-Build (DBB) and Design-Build (DB) and gauging project performance (PP) through the lens of the triple constraints (time, cost, and quality) as the criteria for measuring success. A conceptual model was theorized and operationalized in a survey of 375 project managers and consultants from two Yemeni governorates, Aden and Hadramout. The questionnaire employed a 5-point Likert Scale. Subsequently, the data were evaluated using multivariate regression. The empirical findings revealed a significant relationship between the choice of project delivery method and project performance. Thus, exerting a positive influence on project success. This study contributes to the existing body of knowledge in two significant ways. First, by scrutinizing the dynamic mechanisms through which project delivery methods impact project performance. Secondly, offers valuable insights for decision-makers in the Yemeni construction industry (YCI) to plan their objectives and achieve the requisite project performance levels.

Authors and Affiliations

Fahd M. M. Nasser, Nahg Abdulmajid Alawi, Abaidullah M. , Asniza Yusuf

Keywords

Related Articles

The Scientology of Hypothesis Testing in Empirical Research: Emphasizing Economic Significance

Over the decades, scientists across various disciplines have cautioned against the practice of over-emphasizing statistical significance at the expense of economic or practical significance. It seems that empirical resea...

The Fleeting Possibility of Merging the World’s Largest Chip Manufacturer in 2017: The Pain of Chinese Chip Industry

This article examines a possible Chinese semiconductor industry’s merger and acquisition in 2017, the year before the Sino-US trade war and US high-tech sanctions against China. The feasibility of a merger between Tsingh...

Assessment of Internal Audit Tools: A Study of Some Government Health Institutions in Ghana

The growing number of allegations on financial statement fraud, lack of accountability, misappropriation and mismanagement of public resources in public institution has created an increase attention for the need of inter...

Dynamic and Static Effects of Digital Services Trading on Economic Growth of World Regions

The study examines the effect of digital services trading on the economic growth of panel data from five (5) world regions, namely, Africa, Asia, Latin America, Europe, and the Organization for Economic Cooperation and D...

Strategies for Increasing Self-Confidence in Financial Management Through Behavior: Predictors of Financial Prosperity of Creative Industrial Craft Exporters Malang Indonesia

The involvement of Small and Medium Industries (IKM) in the national economy gives rise to challenges, including issues with human resource capacity, ownership, financing, marketing, and several other concerns about busi...

Download PDF file
  • EP ID EP731122
  • DOI https://doi.org/10.54536/ajebi.v3i1.2253
  • Views 38
  • Downloads 0

How To Cite

Fahd M. M. Nasser, Nahg Abdulmajid Alawi, Abaidullah M. , Asniza Yusuf (2024). Empirical Analysis of the Relationship between Project Delivery Method on Project Performance in the Yemen Construction Industry. American Journal of Economics and Business Innovation (AJEBI), 3(1), -. https://europub.co.uk/articles/-A-731122