Environmental determinants of road construction process in Poland 

Journal Title: Roads and Bridges - Drogi i Mosty - Year 2010, Vol 9, Issue 2

Abstract

The paper covers selected environmental problems associated with road construction in Poland. Road works are linear in nature, which makes the investment process exceptionally difficult and complex, requiring the involvement of large human potential, time-consuming and very expensive. The article presents successive stages of road construction, from the preliminary stage to opening the road for users. Each stage of road construction process in Poland is related to environmental protection issues. Currently, in the days of sustainable development, it is not possible to obtain a decision on environmental conditions in order to be granted the development consent without including in design the solutions which guarantee minimisation of the influence of the project on the environment. Moreover, the applied technology and building materials must also comply with the eco-development requirements. This paper discusses the selected environmental issues present during the road design process (the problem of route selection process, public consultations, using instruments for environmental protection) and these related to the construction process (localisation, development and organisation of the building site facilities, water and waste management and on the building site, environmental declarations, recycling). This study is not attemped to be exhaustive, only selected issues are addressed in order to draw attention to the nature and importance of the environment protection problems arising in the complex process of roads development. 

Authors and Affiliations

Keywords

Related Articles

Influence analysis of counterweight type used in static plate test on identified parameters of pavement courses and subgrade

The requirements of the current standards and specifications do not give clear guidance as to the design of counterweight during the static plate load test. For example, there are no detailed requirements concerning the...

Use of GPR method for investigation of the mass movements development on the basis of the landslide in Kałków

Landslides are a kind of mass movements posing a major threat to the transport routes. There were numerous landslides in Poland in 2010, damaging many roads and buildings. As a result landslide surveys have become more c...

The bridge over the Ina River - the history and the analysis of capacity

This article is about a two-span bridge over Ina river located on the provincial road number 142. It was built in early forties of the 20th century as a highway bridge. It was a part of Berlin - Koenigsberg route built...

Aktywne tłumienie drgań jednowymiarowego ośrodka ciągłego pod obciążeniem ruchomym

Praca prezentuje wyniki badań półaktywnego sterowania drgań jednowymiarowego ośrodka ciągłego pod obciążeniem ruchomym. Konstrukcje przęseł mostowych obciążonych pojazdami poruszającymi się z dużą prędkością można wzmocn...

Wykorzystanie metod uczenia maszynowego do rozpoznania związków między składem betonu modyfikowanego dodatkami popiołowymi a jego właściwościami

W pracy wykorzystano dwa algorytmy uczenia maszynowego do określenia związków między składem betonu modyfikowanego popiołami ze spalania węgla kamiennego i brunatnego, a trwałością na agresywne oddziaływanie środowiska....

Download PDF file
  • EP ID EP152680
  • DOI -
  • Views 93
  • Downloads 0

How To Cite

(2010). Environmental determinants of road construction process in Poland . Roads and Bridges - Drogi i Mosty, 9(2), 31-52. https://europub.co.uk/articles/-A-152680