EVM MODIFICATIONS TO IMPROVE COST CONTROL OF CONSTRUCTION PROJECTS

Abstract

Earned Value is a well known project management tool that uses information on cost, schedule and work performance to establish the current status of the project. For all of the accomplishments of (EVM) in expressing and analyzing cost performance, it has not been as successful for schedule performance. The (EVM) schedule indicators are reported in units of cost rather than time. This fundamental mistake is not just semantic. It influences the schedule performance indicators in a way that make them practically useless and often even misleading. Beyond this problem, there is the much more serious issue: the (EVM) schedule indicators fail for projects executing beyond the planned completion date. The objective of this paper is to discuss the basic principles, main goals and benefit of the use of (EVM) in projects. In addition, the paper attempts to clarify the application of common time (EVM) metrics and compare them with the new set of time metrics to interpret the schedule performance of a project. All satisfactory results of the (EVM) application are displayed in this paper by using a case study which is conducted to compare and demonstrate the difference of analysis between both methods.

Authors and Affiliations

Hesham A. Abd-Elkhalek,

Keywords

Related Articles

 Optimal Placement of Relay Nodes in Multi-pair Co-Operative Network to Increase System Capacity in WSN

 With the advancement of technology the usage of wireless sensor network are increasing day by day. There are two types of sensor networks: Single tiered and multi-tiered [5]. In single tired sensor network there i...

 AN INQUIRY BASED ANALYSIS OF JUDICIAL AND TEMPORAL DATABASES

 A temporal database is a database with built-in support for handling data involving time, being related to the slowly changing dimension concept, for example a temporal data model and a temporal version of Structu...

 Partial Purification of Alpha-Amylase Produced by Brevibacillus Borstelensis R1

 Ideal purification should optimize both the purity and the concentration of the metabolite. Alpha-amylase is an extracellular enzyme. The precipitate collected from 70% (NH4)2SO4 salting-out was dissolved in requi...

 Intuitionistic (α, β)- Fuzzy Hv-Subgroups

 Atanassov introduced the notion of intuitionistic fuzzy sets as a generalization of the notion of fuzzy sets. In this paper we introduce the concept of an intuitionistic (α β, ) -fuzzy Hv-subgroups of an Hv-groups...

EXPERIMENTAL STUDY ON UTILIZATION OF WASTE PLASTIC AS AGGREGATE IN CEMENT MORTAR

Solid waste management is one of the major environmental concerns in our country now a days. The present study covers the use or recycled plastics as replacement of coarse aggregates in concrete. The main aim of the stud...

Download PDF file
  • EP ID EP117601
  • DOI -
  • Views 72
  • Downloads 0

How To Cite

Hesham A. Abd-Elkhalek, (0). EVM MODIFICATIONS TO IMPROVE COST CONTROL OF CONSTRUCTION PROJECTS. International Journal of Engineering Sciences & Research Technology, 5(1), 739-753. https://europub.co.uk/articles/-A-117601