Financial Feasibility Study of Binjai – Langsa (Pangkalan Brandan – Langsa Section) Toll Road Project

Journal Title: International Journal of Current Science Research and Review - Year 2024, Vol 7, Issue 08

Abstract

This study evaluates the Financial Feasibility of the Pangkalan Brandan – Langsa Toll Road Section Project. The purpose of this study is to calculate the Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP), Discounted Payback Period, and Profitability Index (PI) for the Pangkalan Brandan – Langsa Toll Road Section Project. The study results show that this project has a positive Net Present Value (NPV) of Rp. 12,773,885,792,000, therefore it is financially feasible. The project also has an Internal Rate of Return (IRR) of 13.26% which is higher than the discount rate of 9.22%, therefore it is financially feasible, and a Payback Period (PP) of 16.4 years and a Discounted Payback Period of 27.7 years which are still within the 50-year concession period, therefore it is financially feasible. Additionally, this project has a Profitability Index (PI) of 2.5190 which is higher than 1, making it financially feasible. In conclusion, the Binjai – Langsa Toll Road Project (Pangkalan Brandan – Langsa Section) is financially feasible. The recommendation given is timely project execution to avoid cost overruns.

Authors and Affiliations

Mahar Muliawan, Isrochmani Murtaqi,

Keywords

Related Articles

Proposed Marketing Strategy for PT Safaat

Indonesia has strong economic growth, driven by a large and growing consumer market, provides significant opportunities for companies in the fuel transportation sector to access a growing middle class and increasing cons...

Higher Order Thinking Skill of IX Grade Students in Solving Mathematics Problems Based on Bloom's Taxonomy

The purpose of this study is to describe and find out the high-level thinking skills of IX grade students in solving PISA mathematical problems based on Bloom’s Taxonomy. The subjects in this study were 58 students drawn...

Prescription Pattern of Cholelithiasis at Surgery Ward in Tertiary Care Hospital

Background: Cholelithiasis is a chronic recurrent disease of the hepatobiliary system. The impaired metabolism of cholesterol, bile acids and bilirubin are characterized by gallstone formation.The number of surgical proc...

Capacity Planning to Increase Mechanic Availability in After-Sales Service at PT. Elang

After-sales service is critical in selling products such as heavy equipment, which require maintenance from mechanics who understand the product. PT. Elang is one of Indonesia’s heavy equipment distributors and provides...

Applying Warren Buffet’s Investment Strategy to Indonesia Stock Market

In the past five years, there has been a significant surge in local Indonesian investors, predominantly comprising millennials and Gen Z, contributing to the positive growth of the stock market. However, a concerning phe...

Download PDF file
  • EP ID EP742843
  • DOI 10.47191/ijcsrr/V7-i8-54
  • Views 10
  • Downloads 0

How To Cite

Mahar Muliawan, Isrochmani Murtaqi, (2024). Financial Feasibility Study of Binjai – Langsa (Pangkalan Brandan – Langsa Section) Toll Road Project. International Journal of Current Science Research and Review, 7(08), -. https://europub.co.uk/articles/-A-742843