Financial Impediments in Harnessing Thar Coal for the Creation of Electrical Energy in Pakistan

Journal Title: International Journal of Management Sciences - Year 2014, Vol 3, Issue 5

Abstract

The goal of this research is to identity the financial impediments in harnessing Thar coal reserves for the creation of electrical energy in the country. It is estimated that about 175 billion tons of Lignite reserves are located near Islamkot (Tharparkar district) and it is the fourth largest reserve in the world that is spread over 9100 square kilometers. The cost estimation of these reserves is about $ 25 trillion. These reserves have potential to generate 100,000 MW of electricity for 300 years and Di-Methyl Ether (Diesel) can also be produced from this coal. These reserves are greater than the summation of total oil reserves of Saudi Arabia and Iran. Thar coal block II and VIII is enough to generate electricity for 40 and 76 years for Pakistan respectively. The huge finance of approximately USD 2.6 billion is required to utilize these Coal reserves for energy purpose and some agreements were signed for the development of these coal reserves but all proposals and agreements falsified due to financial problems which have been thoroughly discussed and highlighted in this study.

Authors and Affiliations

Farhan-ul-Furqan Khan, Ahmed Tunio, Shakeel Ahmed, Qazi Muhammad Moinuddin Abro

Keywords

Related Articles

The Impact of Jordan’s Economic Infrastructure and Institutions on the Performance of Its Financial Market

This paper illustrates the important role of the economic infrastructure and institutions on Amman Financial Market (AFM) development in Jordan. However, many international studies demonstrate that natural resources (e...

Cultural Dimensions of Pakistan: A Comparison of Sindh, Punjab, Balochistan and Khyber Pakhtunkhwa Provinces

Dowling et al, (2008), elaborates that cultural understanding can direct to better success of international business endeavors and absence of it can only as well direct to their failure. The Provinces of Sindh, Punjab,...

Entrepreneurship Education as Helicopter for Entrepreneurship Development: Nigerian Perspective

Although the typical Nigerian entrepreneurship has always been conceived at the family level success would depend on possession of basic qualities in addition to the skills and knowledge about the technical and functio...

A Test of the Impact of Leadership Styles on Employee Performance: A Study of Department of Petroleum Resources

Managing an organization for effectiveness requires effective leadership. There abound different styles of leadership with attendant different effects. This paper studied the effect of transformational, transactional an...

The Impact of Safety and Health Concerns on Environmental Attitudes towards Green Electronic Products among Lecturers

The purpose of this study is to contribute to the body of knowledge within the area of environmental attitudes towards green marketing. Therefore, this study intends to identify the influence of safety and health concer...

Download PDF file
  • EP ID EP26852
  • DOI -
  • Views 329
  • Downloads 4

How To Cite

Farhan-ul-Furqan Khan, Ahmed Tunio, Shakeel Ahmed, Qazi Muhammad Moinuddin Abro (2014). Financial Impediments in Harnessing Thar Coal for the Creation of Electrical Energy in Pakistan. International Journal of Management Sciences, 3(5), -. https://europub.co.uk/articles/-A-26852