FLEXIBILITY IN MANAGEMENT OF MODERNIZATION IN CONSTRUCTION - ELECTRICAL WORKS

Journal Title: Civil and Environmental Engineering Reports - Year 2015, Vol 2, Issue 17

Abstract

The article presents the general principles of flexible approach, illustrated with case study regarding flexibility in modernization. Flexibility is understood in the present case as a skilful adaptation to changes in the dynamically changing environment. The essence of flexibility approach is being staged to make decisions based on environmental and process monitoring in progress. Presented case study of upgrading the electrical system in the multi-family housing in the common area is based on step by step procedure responding to damage state of this system. Simple analysis is based on cost comparison but there are other criteria (environmental, social etc.) and conflict solving situations taken into account in presented paper.

Authors and Affiliations

Piotr NOWOTARSKI, Jerzy PASŁAWSKI

Keywords

Related Articles

Successfull urban regeneration project: Gdańsk-Letnica district case study

This paper presents the process of urban regeneration of Gdansk Letnica district, a project that from a very short time perspective can be described as successful. The paper will present a brief district’s history as wel...

ULTRASONIC INTENSIFICATION OF AEROBIC STABILIZATION OF SEWAGE SLUDGE

The aerobic stabilization of excess sewage sludge using low frequency ultrasound (25kHz) was investigated. The mechanically thickened excess sludge was obtained from full-scale wastewater treatment plants. The samples of...

ANALYSIS OF CHANGES TO STEEL FOOTBRIDGE GEOMETRY WITHIN 25 YEARS IN SERVICE

Identification of the technical condition of bridge structures should be supplemented by determination of structural displacements in relation to the adopted frame of reference and measurement of changes to the geometry...

THE EXPERIMENTAL STUDY OF THE EFFECTIVE THERMAL CONDUCTIVITY OF BUNDLES OF RECTANGULAR STEEL SECTIONS

Bundles of rectangular steel sections are examples of the porous charge. Due to the voids within the sections, this type of charge is characterized by porosity even exceeding 85%. This makes the thermal properties of the...

Statistical analysis of flood risk factors

The durability of hydrotechnical structures, especially flood embankments, depends largely on the correct identification of natural phenomena occurring in both the embankment body and the foundation. Such a phenomenon -...

Download PDF file
  • EP ID EP239718
  • DOI -
  • Views 71
  • Downloads 0

How To Cite

Piotr NOWOTARSKI, Jerzy PASŁAWSKI (2015). FLEXIBILITY IN MANAGEMENT OF MODERNIZATION IN CONSTRUCTION - ELECTRICAL WORKS. Civil and Environmental Engineering Reports, 2(17), 117-128. https://europub.co.uk/articles/-A-239718