Formalization of selection of contract-organizational project delivery strategy

Abstract

<p>The formalized system to select a strategy for the implementation of a capital construction project was developed. This is important because an error in making a strategic decision (in an intuitive rather than formalized way) critically affects the further course of events on a project and usually cannot be fixed through the efforts of tactical and operative control. Throughout the whole range of strategies, a number of those, which have characteristic features, and therefore affect specifically project initiators, were determined. Discreteness of the field of alternatives gives a possibility to avoid "fuzziness" in making decisions on the most appropriate strategy. The system became unified through the separation of two elements in it: (1) variable (movable) context that recognizes the features a specific business situation and the specificity of the analyzed project, (2) constant (unmovable) context that reflects the properties of each of the alternative strategies. The business process of comparative analysis involves three stages: assessment of the organization maturity, identification of the market development level, determining project priorities and conformity of a priority complex with the profiles of key contract-organizational models. The first stage gives an answer to the question: "Is it worth following a multi-variant contract-organizational scheme of project management?", the second one solves the problem "Is it worthwhile applying IPD in the current situation?" and the third one gives a response to the question "Which of the contract-organizational models of the analyzed project should be followed?" Thus, the conceptual model reflects all available alternatives of typical strategies that are applied in the international best practices. The total number of key basic contract-organizational alternatives includes 26 strategies. Both the project space, and the field of strategic alternatives are reflected in an integrated coordinate system "time–costs–value–risk" by the conceptual model. The formalized toolset formed the system of the project agreement-organization models COMPAS. The formalized system makes it possible to make unambiguous well-grounded decisions on project delivery strategies, which in practice will lead to better project results.</p>

Authors and Affiliations

Olexander Bugrov, Olena Bugrova

Keywords

Related Articles

Detecting the influence of heat sources on material properties when producing aviation parts by a direct energy deposition method

<p>Quality of the material obtained by the method of direct energy deposition using three heat sources (plasma arc, electric welding arc and welding arc with cold metal transfer) was studied. AlMg5 alloy wire was used as...

Development of the concept and method of building of specified project management methodologies

<p class="a"><span lang="EN-US">The article is devoted to solving the scientific problem of formation of the project management meta­level – the level of creation and implementation of project management methodologies (P...

Development of the system to integrate and generate content considering the cryptocurrent needs of users

<p>We have investigated processes of analysis, integration, and content generation, taking into consideration the needs of the user in cryptocurrency. By using the developed formal model and the performed critical analys...

On the error-correcting capabilities of iterative error correction codes

<p>The influence of the theory of information on development of the error correcting coding theory has been studied. Main differences between the probabilistic approach and the deterministic approach in the analysis of e...

Experimental study of temperature mode of a fire in a cable tunnel

<p>We established, based on the conducted research into a change in temperature in the cable tunnel during fire, that in the combustion zone the temperature grows faster in comparison with the standard temperature mode o...

Download PDF file
  • EP ID EP528259
  • DOI 10.15587/1729-4061.2018.151863
  • Views 60
  • Downloads 0

How To Cite

Olexander Bugrov, Olena Bugrova (2018). Formalization of selection of contract-organizational project delivery strategy. Восточно-Европейский журнал передовых технологий, 6(3), 28-40. https://europub.co.uk/articles/-A-528259