FUZZY COMPREHENSIVE EVALUATION OF CONSTRUCTION SCHEDULE RISK OF WATER CONSERVANCY PROJECT BASED ON TRIGONOMETRIC NUMBER FUZZYAHP

Journal Title: Topics in Intelligent Computing and Industry Design (ICID) - Year 2017, Vol 1, Issue 2

Abstract

The research of water conservancy project construction schedule risk analysis, risk factors, pre-human control of controllable factor and uncontrollable factors for the development of response measures, the probability of risk reduction, to plays a very important role in successful completion of water conservancy project. In this regard, according to the actual situation of water conservancy projects and combined with relevant literature, the paper establishes 7 first level indexes and 22 two level indexes that affect the construction schedule risk of water conservancy projects. Then, the triangular number Fuzzy-AHP model is constructed to calculate the weight of risk factors, and the fuzzy comprehensive evaluation method is used to evaluate the risk. In the Hui Xian section of the middle route of South to north water diversion culvert Yu He river protection wear reinforcement engineering for example, the higher the risk, the greater the weight factors, take preventive measures to reduce the risk, to control the total construction schedule risk, provides a reasonable way to control for the construction of water conservancy project schedule risk

Authors and Affiliations

Hong Wenxia, Han Yan, Qian Jinyu

Keywords

Related Articles

A REASONING ALGORITHM BASED ON NOVEL EXTENSION RULE IN WUMPUS WORLD

This paper presents a new algorithm based on Novel Extension Rule for reasoning problems in Wumpus World. This algorithm describes these problems by propositional logic terms and solves them with Novel Extension Rule. In...

A MULTIDISCIPLINARY STUDY FOR SEISMIC HAZARD IN MARMARA SEA REGION,TURKEY

The Marmara Sea region of Turkey is one of the most active continents in nowadays tectonics. The crustal tectonic movement and deformation are of great scientific significance to the understanding of the continental dyna...

APPLICATION OF FEEDFORWARD-FUZZY ADAPTIVE CONTROL IN THE CONTROL OF ADSORPTION TOWER OF DRY DESULFURIZATION

Flue gas purification of a domestic steel mill using activated carbon desulfurization process. Among them, the flue gas treatment method of the adsorption tower is filled with activated carbon and flue gas permeated and...

APPLICATION OF INDOOR POSITIONING BASED ON KPCA AND BP NEURAL NETWORK ALGORITHM

As the location method of indoor fingerprint position needs to be conducted in a region with signal coverage, the signal intensity’s information of all Access Points has to be collected to build a fingerprint database. A...

DESIGN OF THE DOUBLE-LOOP NETWORKED CONTROL SYSTEM WITH DIFFERENT SAMPLING RATE BASED ON SMITH PREDICTOR

The double-loop networked control system with different sampling rate is investigated in this paper. In order to overcome the effect of network-induced time delay, the design methods based on conventional Smith predictor...

Download PDF file
  • EP ID EP409300
  • DOI 10.26480/icie.01.2017.56.59
  • Views 72
  • Downloads 0

How To Cite

Hong Wenxia, Han Yan, Qian Jinyu (2017). FUZZY COMPREHENSIVE EVALUATION OF CONSTRUCTION SCHEDULE RISK OF WATER CONSERVANCY PROJECT BASED ON TRIGONOMETRIC NUMBER FUZZYAHP. Topics in Intelligent Computing and Industry Design (ICID), 1(2), 56-59. https://europub.co.uk/articles/-A-409300