FUZZY COST OVERRUN ANALYSIS MODEL FOR CONSTRUCTION PROJECT

Journal Title: JOURNAL OF ADVANCES IN CHEMISTRY - Year 2016, Vol 12, Issue 16

Abstract

Now a day’s many factors which affect the productivity in construction project. Due to this delay factors time and cost overrun in a project. In this research helps to identify the most important factors that affect the productivity and form a modelling using fuzzy logic. The data’s were collected through questionnaire survey from engineers, contractors and clients worked within the various construction industries. The collected data’s were analyzed using relative importance index (RII) and ranking the factors based on percentage of relative importance and also this paper presents an application of fuzzy logic for developing delay factors causes cost overrun  model using Fuzzy toolbox of MATLAB Program software. The results can facilitate the construction industry to take measures the delay factors causes cost overrun in construction projects.

Authors and Affiliations

Shanmuganathan. N, Baskar. G

Keywords

Related Articles

Isolation of crude-oil-degrading Sphingomonas paucimobilis from the Persian Gulf and Caspian Sea

Oil spills are a major menace to the environment because they severely damage the surrounding ecosystems. Persian Gulf in this century, Situating in the middle east, having more than 65 percent of world’s oil and gas r...

Insertion Reactions Between Singlet Carbenes and Alcohols: Mechanistic insights from ab Initio and DFT Study

The insertion reactions of 1CH2, 1CHF and 1CF2 into 1o and 2o polar O-H bonds of methanol, ethanol, 1-propanol and 2-propanol have been investigated at ab initio (HF, MP2) and DFT levels using 6-31g (d, p) basis set. In...

Mechanism of Electron Transfer Reaction of Cr(III) Iminodiacetate Ternary Complex Involving Malonate with N-Bromosuccinimide

The kinetics of oxidation of the chromium (III) complexes, [CrIII(IDA)(Ma)(H2O)]- [IDA=iminodiacetate, Ma=malonic] by N-bromosuccinimide in aqueous solution to yield chromium(IV) has been studied spectrometrically at 25-...

Food shortage in Zimbabwe: Can wild cereal grains be an alternative source of nutrition?

Cereals are used as staple food in most countries all over the world including Zimbabwe. Unfortunately, poor rainfall patterns have hampered the production of traditional cereals like maize and wheat leading to poverty e...

IMPROVING THE PERFORMANCES OF ELECTRO-DISCHARGE DRILLING PROCESS PARAMETERS

The variation in a machining process is reduced by Taguchi method through robust design of experiments. The primary objective of this method is to produce the parts with high quality at lower cost. Taguchi method is comm...

Download PDF file
  • EP ID EP652957
  • DOI 10.24297/jac.v12i16.678
  • Views 167
  • Downloads 0

How To Cite

Shanmuganathan. N, Baskar. G (2016). FUZZY COST OVERRUN ANALYSIS MODEL FOR CONSTRUCTION PROJECT. JOURNAL OF ADVANCES IN CHEMISTRY, 12(16), 4913-4923. https://europub.co.uk/articles/-A-652957