Human Aspects in Implementation of Total Productive Maintenance

Abstract

The manufacturing industry has gone through significant changes in the last decade. Competition has increased dramatically. Customers focus on product quality, product delivery time, safety and cost of product. Because of these, company should introduce a system to improve and increase quality, productivity and safety continuously. The aim of this paper is to study the Human Aspects in Implementation of Total Productive Maintenance. In this paper, we have taken the case study to demonstrate the Total Productive Maintenance implementation methodology and to highlight the benefits achieved during Total Productive Maintenance in an engineering industry XYZ Pvt. Ltd. (name changed) situated in Indore, Madhya Pradesh. TPM proved that its implementation helped the company significantly to achieve higher Productivity, Quality, Cost, Delivery, Safety, Morale, customer satisfaction and profits or the improvements in key performance indicators (PQCDSM). Based on the analysis for achieving operational excellence 5S, LeadTime Reduction / Throughput time Reduction, Kaizen and preventive maintenance are important. Whereas Poka-Yoke and visual control are necessary activities for implementation of Total Productive Maintenance. S R Chandra Shashidhar K | Dr. Devendra S Verma"Human Aspects in Implementation of Total Productive Maintenance" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-2 | Issue-2 , February 2018, URL: http://www.ijtsrd.com/papers/ijtsrd9396.pdf http://www.ijtsrd.com/engineering/mechanical-engineering/9396/human-aspects-in-implementation-of-total-productive-maintenance/s-r-chandra-shashidhar-k

Authors and Affiliations

Keywords

Related Articles

A Study to Assess the Level of Knowledge Regarding Airway Management Modalities among Nursing Student at Selected Nursing, College Kanpur

INTRODUCTION Airway management includes a set of maneuvers and medical procedures performed to prevent and relieve airway obstruction. Due to obstruction in the airway the life of the individual is in danger so use of ai...

A Review on Contract Management on Sewage Treatment Plant STP

A study on domestic waste water characterization has been performed followed by the design of sewage treatment plant. The present study involves the analysis of pH value, total solids, total suspended solids, hardness, a...

Hydrogeochemical Analysis and Quality Evaluation of Groundwater for Irrigation Purposes in Puri District,Odisha

The present study is carried out in the Puri district, Odisha, India to ascertain the suitability of groundwater for irrigation purposes. The parameters used to ascertain the suitability of groundwater for irrigation pur...

An Assessment of the Importance of Ifa Divination as Part of Igala Culture

This research work is aimed at studying the importance of Ifa divination among the Igala people. It was discovered that Ifa has various roles in our society such as acting as a medium of communication between humans and...

Floral Initiation of Poinsettia Euphorbia Pulcherrima as Affected by Photoperiod and Different Rates of Paclobutrazol

Increase in knowledge of Chemical properties of soil will prevent or reduce road failure in tropical climate such as Nigeria. This study aimed at assessing some chemical properties of lateritic soil deposited in Isan - E...

Download PDF file
  • EP ID EP359095
  • DOI -
  • Views 85
  • Downloads 0

How To Cite

(2018). Human Aspects in Implementation of Total Productive Maintenance. International Journal of Trend in Scientific Research and Development, 2(2), -. https://europub.co.uk/articles/-A-359095