IDENTIFICATION OF CONSTRAINTS IN PROJECT SCHEDULE MANAGEMENT

Journal Title: International journal of research -GRANTHAALAYAH - Year 2019, Vol 7, Issue 2

Abstract

Theory of Constraints (TOC) is new concept of project management. Every project has some constraints. This study explores the constraints to improve the project performance dealing with time constraint with a case of Sankosh-Tipling Road project and Bhimdhunga-Lamidanda Road Project of Dhading District. Questionnaire survey, Project report analysis, Key informant interview and case studies were the methods used for the data collection and content analysis, S-Curve and interim payment assessment were done to process the data. The major constraint among several other constraints in Bhimdhunga-Lamidanda Road project, legal constraint which is restriction of District Coordination Committee (DCC) to collect gravel and boulders from river and quarry sites was found as major constraint in the project. Constraint has affected with time extension for total 309 days with progress of only 34.76% till 13 june, 2017. Thus, this study has assumed that project could be completed within previously proposed deadline if different counter measures which have been suggested with consideration of TOC.

Authors and Affiliations

Keywords

Related Articles

SUSTAINABILITY AND DEMOCRATIC SCHOOL MANAGEMENT

Motivation/Background: Sustainability is established on economic, environmental and social pillars, which are understood as inseparable. This demands changes of paradigms and the construction of new models of living, whi...

THE PRODUCTION AND MARKETING OF BANANA IN VILAVANCODE TALUK

India is the largest banana producer in the world and the cultivators face many problems during cultivation. The productivity of banana in India is far from satisfactory. At present the development of agriculture does no...

A STUDY ON NEW HIRING STRATEGIES TO MANAGE TALENT CRISIS AT ENTRY LEVEL FROM THE PERSPECTIVE OF RECRUITERS AND FRESH GRADUATE ENGINEER JOB SEEKERS

Internet apart from influencing life of people has also emerged as a key HR tool for acquiring talent. Traditional HR strategies are being modernized, driven by technology and innovations. The remarkable popularity of in...

OPERATIONAL STATUS OF MANAGEMENT INFORMATION SYSTEMS OF STATE UNIVERSITIES AND COLLEGES IN SAMARLEYTE ISLANDS

This paper aims to determine the MIS unit’s operational status and the performance level of information systems of the state universities and colleges in the Samar-Leyte Islands. In order to determine and appreciate the...

ORGANIC PLASTICS: MATERIAL FOR SICK BUILDING SYNDROME CONTROL AND PREVENTION IN BUILDING CONSTRUCTION

Plastics are organic materials, which consist of synthetic or natural high-molecular compounds (polymers). Due to the large variety of plastic, its different types have different properties, which make it possible to wid...

Download PDF file
  • EP ID EP467604
  • DOI 10.5281/zenodo.2580485
  • Views 77
  • Downloads 0

How To Cite

(2019). IDENTIFICATION OF CONSTRAINTS IN PROJECT SCHEDULE MANAGEMENT. International journal of research -GRANTHAALAYAH, 7(2), 18-35. https://europub.co.uk/articles/-A-467604