Identifying the Causes of Delay in the Building Sector in Egypt: A Case Study of Small and Medium-Sized Companies

Journal Title: SCIENCE, ENGINEERING AND TECHNOLOGY - Year 2023, Vol 3, Issue 1

Abstract

Delay in the construction industry is known to be a significant issue as indicated by many studies in the past few years. The construction sector in Egypt is not an exception as a wide range of projects are suffering from time overrun. the presence of time overrun in the project is the root of other problems such as cost overrun and poor quality. Hence, one of the simplest ways of dealing with delays is by identifying the causes and sources of delays in construction projects in Egypt. Therefore, this paper discussed the causes of delay in the building sector in Egypt according to the perspective of professional parties working in different small and medium-sized companies. The main method of data collection was a questionnaire survey with small and medium-sized companies in Egypt. The participants had more than 5 years of experience in the Egyptian construction sector. The financial problems faced by owners were considered significant by two different companies which indicates that this factor is usually the reason for delays in projects in Egypt. Ineffective planning and scheduling have also proven to be important in the procedure of preventing delays as it was mentioned by all experts involved in the data collection. This study has shown that the perspective of experts working in different companies may not be the same regarding the causes of delays in the construction sector. The adequate understanding of the causes aids in proposing effective strategies that can reduce the occurrence and impact of delays.

Authors and Affiliations

Wahbi Albasyouni, Abdallah Elbassal

Keywords

Related Articles

Review of Smartphone as an Office: Security Risks and Mitigation Measures

Smartphones have become the most popular mode of communication as well as a novel mode of work, allowing users to work from anywhere and increasing their efficiency and responsiveness. However, the flexibility and conven...

Brain Computer Interfaces: The Future of Communication Between the Brain and the External World

This paper provides a comprehensive review of the current state of research on Brain Computer Interfaces (BCIs) and their potential applications. The objective of this study was to gather information from various sources...

Modelling of Pollutants Dispersion from Open Burning of Solid Waste Using AERMOD

This study evaluates the air quality impact of open burning of solid waste activities in Ilorin, Nigeria. An emission inventory was carried out to quantify the emitted CO, NOx and SOx from 2016- 2020 into the study area....

Fatigue life prediction of mistuned steam turbine blades subjected to deviations in blade geometry

The blades of the steam turbine are subjected to bending of the steam flow, centrifugal loading, vibration response, and structural mistuning. These factors mentioned contribute significantly to the fatigue failure of st...

Recognition of traffic generated by WebRTC communication

Network traffic recognition serves as a basic condition for network operators to differentiate and prioritize traffic for a number of purposes, from guaranteeing the Quality of Service (QoS), to monitoring safety, as wel...

Download PDF file
  • EP ID EP716890
  • DOI 10.54327/set2023/v3.i1.55
  • Views 40
  • Downloads 0

How To Cite

Wahbi Albasyouni, Abdallah Elbassal (2023). Identifying the Causes of Delay in the Building Sector in Egypt: A Case Study of Small and Medium-Sized Companies. SCIENCE, ENGINEERING AND TECHNOLOGY, 3(1), -. https://europub.co.uk/articles/-A-716890