Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

Journal Title: Engineering, Technology & Applied Science Research - Year 2016, Vol 6, Issue 4

Abstract

Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW) method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.

Authors and Affiliations

D. Mirzai Matin

Keywords

Related Articles

Modeling of Fatigue Crack Propagation in Aluminum Alloys Using an Energy Based Approach

Materials fatigue is a particularly serious and unsafe kind of material destruction. Investigations of the fatigue crack growth rate and fatigue life constitute very important and complex problems in mechanics. The under...

Business Hypervisors for Real-time Applications

System virtualization is one of the hottest trends in information technology today. It is not just another nice to use technology but has become fundamental across the business world. It is successfully used with many bu...

Influence of Austenite Phase Transformation on Existing Microstructure of Low C-Mn Steel

Cold heading quality CHQ steel is widely used for making small components due to its excellent cold heading response. Austenite nucleation and growth morphology of a commercial CHQ steel has been studied by continuous he...

A Comparative Application for Evaluating Composite Fabrics Used in Electromagnetic Shielding

Composite fabrics containing metal filaments are used widely for preventing electromagnetic radiation. Many experiments involving them are carried out continuously. Results are simulated in order to analyze their perform...

Designing a Model for Knowledge Socialization Using Sociability Processes of Human Resource Management: A Case Study

This study develops a model for knowledge socialization using sociability processes of human resources through an applied research approach. Two types of participants participated in this study. The first type included a...

Download PDF file
  • EP ID EP109658
  • DOI -
  • Views 237
  • Downloads 0

How To Cite

D. Mirzai Matin (2016). Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects. Engineering, Technology & Applied Science Research, 6(4), -. https://europub.co.uk/articles/-A-109658