IMPROVEMENT FOR AN ASSEMBLY FLOW FOR A GIVEN COMPONENT (1)

Journal Title: Fiability & Durability - Year 2017, Vol 19, Issue 1

Abstract

This study is carried out in a line of assembly of a finite wiring product. The assembly of this finished product is done in two specific sections. For the analysis of the activities in the assembly section, the timing method of the work stations was used. On the basis of the work times obtained and their centralization, the Keizen method was subsequently applied to obtain an improvement in the installation flow. Finally, a reduction in working times was achieved, as well as a more ergonomic arrangement of jobs. This paper is the first in a series of 3 papers to deal with this subject.

Authors and Affiliations

BĂLTEANU Ancuţa, BÂLDEA Monica

Keywords

Related Articles

ASPECTS CONCERNING THE IMPLEMENTATION OF A METHODOLOGY FOR DETERMINING THE COLUMNS DIAMETERS OF GUIDING A PRESE - (Part II)

In this paper we present a methodology for determining the value of the diameters of the guide column of a press which has a construction with closed frame. For determining these values is necessary to go through several...

CONSIDERATIONS ON CONTACTLESS ELECTROMAGNETIC MEASUREMENT OF HUMIDITY IN PEDOLOGY

To put into practice the conventional determination of resistivity by the galvanic method, requires a relatively large amount of labor and is, therefore, expensive. At the basis of any interpretation are the lateral or v...

ANALYSIS OF COMPENSATING CABLE CONNECTING DEVICES FOR WINDING INSTALLATION VESSELS

Winding installations have the role of transporting, between underground and surface, useful minerals, materials, equipment, and people, with extraction vessels. Cable connecting devices connect winding installation cabl...

DETAILS OF OPERATIONS PERFORMED BY THE REMOTE CONTROL ROBOT (CONCEPT) TO THE HORIZONTAL FUEL CHANNEL DURING DECOMMISSIONING PHASE OF NUCLEAR REACTOR CALANDRIA STRUCTURE. PART I: OUTSIDE OPERATIONS

The authors contribution to this paper is to present a concept solution of a remote control robot (RCR) used for the horizontal fuel channels pressure tube decommissioning in the CANDU nuclear reactor. The authors highli...

ASPECTS CONCERNING THE IMPLEMENTATION OF A METHODOLOGY FOR DETERMINING THE COLUMNS DIAMETERS OF GUIDING A PRESE - (Part I)

In this paper we present a methodology for determining the value of the diameters of the guide column of a press which has a construction with closed frame. For determining these values is necessary to go through several...

Download PDF file
  • EP ID EP232160
  • DOI -
  • Views 72
  • Downloads 0

How To Cite

BĂLTEANU Ancuţa, BÂLDEA Monica (2017). IMPROVEMENT FOR AN ASSEMBLY FLOW FOR A GIVEN COMPONENT (1). Fiability & Durability, 19(1), 178-183. https://europub.co.uk/articles/-A-232160