IMPROVING LABOR PRODUCTIVITY ON BUILDING CONSTRUCTION PROJECTS

Abstract

In order for businesses to succeed, management must keep a close eye on the bottom line. One of the many factors that directly affect a firm's profitability is worker productivity. The purpose of this research is to measure and study variability of construction labor p roductivity in building construction project and to demonstrate the conceptual benchmarking principles for construction labor productivity, by the use of indices and measures of benchmarking in labor productivity. Indices such as the disruption index (DI), performance ratio (PR), project management index (PMI) are calculated. The data were collected from two building projects in Thane, Mumbai, India sharing similar exogenous conditions and being similar in scope, size of components, specifications, quality requirements and design features. Literature review was conducted through referred researches and journals to show different findings and theories related to the productivity rates and the methods of improvement. The study shows that the productivity rates of the construction workers vary from one project to another, taking into consideration the type of the activity to be carried out and the surrounding work environment.

Authors and Affiliations

Kharmale Swapnil S , Arjita P. Biswas

Keywords

Related Articles

Identification of Biclustering Algorithms for Gene Extraction

Many clustering approaches have been proposed for the analysis of gene expression data obtained from microarray experiments. However, the results from the application of standard clustering methods to genes are limited...

 Rice Genomes Classification based on Efficient Distance Measures Classifiers

 The structure and composition of genomes is swiftly systematic in pace with their sequencing. The promising data show that a significant portion of Rice genomes is composed of transposable elements. Given the prof...

 HEAT TRANSFER ENHANCEMENT USING FINS WITH PERFORATION: A REVIEW

 Extended surfaces called as fins a passive technique is used for enhancing heat transfer between surface and surrounding fluid. They find applications not only in electronic equipments but also in important areas l...

 UPPER BETWA RIVER WATERSHED MANAGEMENT AND DEVELOPMENT PLAN USING REMOTE SENSING AND GIS

 Watershed management involves management of the land, water and biological resources of a region. In the study Upper Betwa Watershed basin has been taken under investigation. During study complete inventory on geo...

EXPERIMENTAL STUDY ON SOLAR FLAT PLATE COLLECTOR WITH AND WITHOUT COATING

Solar Flat Plate Collector is widely used for domestic hot - water, space heating and cooling, for applications requiring fluid temperature less than 100 o C. The main components associate...

Download PDF file
  • EP ID EP111448
  • DOI -
  • Views 114
  • Downloads 0

How To Cite

Kharmale Swapnil S, Arjita P. Biswas (30). IMPROVING LABOR PRODUCTIVITY ON BUILDING CONSTRUCTION PROJECTS. International Journal of Engineering Sciences & Research Technology, 4(6), 828-834. https://europub.co.uk/articles/-A-111448