INFRASTRUCTURAL FACILITIES DEVELOPMENT AND URBAN DECAY IN OWO CITY

Journal Title: Journal of Advances in Social Science and Humanities - Year 2017, Vol 3, Issue 2

Abstract

This paper examined the decay of urban infrastructure with particular reference to Owo city in Ondo State, Nigeria. The methodology applied depends on survey of questionnaires with the use of systematic random sampling of one in every five houses in Ehinogbe, Ijebu, Iselu and Otutu with fifty (50) questionnaires assigned to each area and the total questionnaires distributed were two hundreds (200). Other methods used were interview and observation. The data collected revealed that there was an upsurge in population which had a multiplier effects on some factors that caused the absurdity that resulted to urban decay of infrastructure in Owo. The tenancy rate of majority of the houses was high and most of them were built with mud more than sixty years ago. Pit latrines became the dominating toilets in houses and well water was the main source of water which was not safe for drinking as it contained contaminants. There was frequent out- break of electricity and waste collection was rarely practised while open and incinerator burning that caused pollution became a common phenomenon. It was recommended that one of the methods to tackle decay could be through periodic population statistics for infrastructure planning and development while dug wells should be well-treated, inspected and supervised by government agencies. The paper concluded that if urban cities are well-coordinated with vibrant law, define policies and prudent administrators, infrastructure development would be sustained.

Authors and Affiliations

Ojo, Idowu Clement, Oni Oluwasola Feyisara, Ojo, Emmanuel Temitope

Keywords

Related Articles

INFRASTRUCTURAL FACILITIES DEVELOPMENT AND URBAN DECAY IN OWO CITY

This paper examined the decay of urban infrastructure with particular reference to Owo city in Ondo State, Nigeria. The methodology applied depends on survey of questionnaires with the use of systematic random sampling o...

THE SIGNIFICANCE OF FORM IN CONFESSIONAL POETRY

The present article aims to explore the significance of form in a number of wellknown Confessional poems. The defining element of Confessional Poetry is its highly personal content and unprecedented frankness; having sai...

Poor Maternal and Child Health in Tanzania amidst Plenty: Review from Tanzania’s Grand Corruption Scandals from 2005-2015

Maternal and Child Health (MCH) in Tanzania like other Sub Saharan African countries is in a gloomy state. The country has failed to achieve the Millennium Development Goals (MDG). Sadly, maternal mortality rate (MMR) st...

Perceptions of Safety Climate in the Air Traffic Control Facilities in China.

This paper uses survey to assess air traffic controllers’ perceptions of organization safety strategy and safety behavior outcome in China. The survey was taken from four Chinese air traffic control facilities across the...

ROLE OF ETHICAL ORIENTATION &PROACTIVE PERSONALITY IN FOSTERING CSR PERCEPTION OF MANAGEMENT STUDENTS

Purpose The purpose of the present study was to examine the role of ethical orientation and proactive personality in fostering Corporate Social Responsibility (CSR) perception of management students. CSR is a philanthrop...

Download PDF file
  • EP ID EP312571
  • DOI 10.15520/jassh32191.
  • Views 105
  • Downloads 0

How To Cite

Ojo, Idowu Clement, Oni Oluwasola Feyisara, Ojo, Emmanuel Temitope (2017). INFRASTRUCTURAL FACILITIES DEVELOPMENT AND URBAN DECAY IN OWO CITY. Journal of Advances in Social Science and Humanities, 3(2), 20228-20238. https://europub.co.uk/articles/-A-312571