Integrated Anti-risk Management of Conflicts of a Scientific Project in a Behavioral Economics

Journal Title: Scientific Journal of Astana IT University - Year 2020, Vol 3, Issue 3

Abstract

The object of the research is the processes of managing uncertainties such as risks, conflicts, and factors of behavioral economics which may have negative consequences for a scientific project. The study has revealed that the success of any project depends on the ability of the project manager to effectively manage his team to meet the values of each stakeholder and the goals of the project itself. To solve this goal it is necessary to complete the following tasks: • analysis of methods of integration of risk management, conflicts and factors of behavioral economics; • justification of the necessity to build integrated anti-risk management of conflicts in behavioral economics; • to carry out conceptual modeling of integrated anti-risk conflict management in behavioral economics. A conceptual model of integrated anti-risk management of conflicts of a scientific project in the context of behavioral economics is proposed, built based on the “Change Management Iceberg” model. The management of scientific projects has been further developed through the integration of methodologies: project management, the theory of stakeholders, risk management, HR management, conflict management, and behavioral economics. A conceptual scheme of integrated anti-risk management of conflicts of a scientific project in behavioral economics has been developed which allows a project manager to manage uncertainties (risks, conflicts, factors of behavioral economics). Research refers to the project management methodology and improves it by integrating the processes of risk, conflict, and behavioral economics management into one process. The main goal of the study is to reduce and eliminate all negative consequences in a scientific project, to complete it within the approved budget, terms and a certain quality.

Authors and Affiliations

D. Bedrii

Keywords

Related Articles

ON THE DEVELOPMENT OF MANAGEMENT MODELS FOR REGIONAL PROGRAMS OF ENVIRONMENTALLY SAFE OPERATION AT CRITICAL TRANSPORT INFRASTRUCTURE FACILITIES

The objects of the critical transport infrastructure are located in all regions of Ukraine, and the question of the safety of these objects is extremely relevant. A functional approach should be used to form an effective...

MODELS AND MCHANISMS MANAGEMENT OF PROGRAM PROJECTS OF SOCIO-ECONOMIC DEVELOPMENT THE TERRITORIES

The scientific article considers an important scientific and applied problem of developing models and mechanisms for projects and programs management for the socioeconomic development of territories by means of financia...

DEVELOPMENT OF A MODEL FOR IMPLEMENTING A CASE METHOD FOR INTERACTIVE STUDY PROCESS MANAGEMENT MONITORING

The importance of this research topic lies in the need to gather, store, analyze and disseminate accurate information on the management status of educational institutions to guarantee the provision of quality educational...

APPROACH AND STRUCTURE OF SPECIAL ORGANIZATIONAL, METHODOLOGICAL AND TECHNOLOGICAL COMPONENTS OF PROJECT AND PROGRAM PORTFOLIO MANAGEMENT SYSTEMS

The functional limitations of modern corporate project and program management systems are presented. It is shown that the main limitation of such systems is connected with the weak implementation of organizational and...

PROJECT MANAGEMENT FIGHTING AGAINST ENTROPY OF THE ORGANIZATION

This study examined the informational entropy of project-oriented organizations within the framework of the energy-entropy concept. The relationship between energy entropy and informational (structural) entropy of projec...

Download PDF file
  • EP ID EP704404
  • DOI 10.37943/AITU.2020.15.62.001
  • Views 86
  • Downloads 2

How To Cite

D. Bedrii (2020). Integrated Anti-risk Management of Conflicts of a Scientific Project in a Behavioral Economics. Scientific Journal of Astana IT University, 3(3), -. https://europub.co.uk/articles/-A-704404