Interchange Renovation Construction Technology of Beijing Subway Line 10 Xitucheng Station
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8
Abstract
Objective Taking the interchange renovation construction of Beijing Subway Line 10 Xitucheng Station as example, the construction scheme for interchange renovation in existing station without reserved transfer conditions is studied. Method To meet the interchange requirements with Beijing Subway Changnan Line, the existing Line 1 Xitucheng Station undergoes an interchange renovation. Openings are made on the side walls of this station concourse floor to connect with the interchange passage. The entire concourse level is cleared and converted into a paid area, with ticket gate and security inspection relocated to ground or underground halls at each entrance. Escalators and elevators are added by creating openings in the floor between the concourse and platform levels. Additionally, settlement deformation monitoring of the concrete structures in the station construction area is conducted to control the impact of activities such as side wall demolition and floor openings on existing station structure. This ensures the safety and stability of the concrete structure during the interchange renovation construction at Beijing Subway Line 10 Xitucheng Station. Result & Conclusion It is suggested to hold long-term foresight in future station planning, carry out station structure design from the macro-perspective of urban rail transit development, and preserve sufficient interchange space.
Authors and Affiliations
Xinfeng YE, Mingli HUANG, Zhien ZHANG, Zichen LI, Ming SUN, Liping FAN
Diagnosis Method for High-Speed Train Axle Box Bearing Slight Faults Based on Improved SAE and Temperature-Vibration Fusion
[Objective] The operating environment of axle box bearings in high-speed train is complex and changeable, and the diagnostic accuracy of single-source signals for weak faults is insufficient. To improve the diagnostic...
Analysis of Metro Vehicle Operational Stability and Safety under Crosswind Effects
Objective When urban rail transit trains operate on elevated tracks, crosswinds have a significant impact on the stability and safety of vehicle operation. It is essential to conduct a more in-depth study on the dynamics...
Positioning System for Burst Pipe Points in Metro Interval Fire Hydrant Systems
[Objective] When water leakage accidents like pipe bursts occur in the fire hydrant system of metro intervals, the train control room will directly close the electric valves on the main pipeline remotely, cutting off w...
Research on Key Technologies for 120 km/h Articulated Light Rail Trains
[Objective] Currently, the design speed of articulated LRV (light rail vehicle) is 100 km/h, which somewhat restricts the expansion of light rail lines to the suburbs, satellite cities, and other areas. Therefore, it i...
Construction Optimization of Shallow Railway Tunnels under Unsymmetrical Pressure for Reducing Blasting Over-excavation
Objective Over-excavation in tunnel construction, mainly caused by inappropriate blasting,will affect the smooth progress and safety of tunnel excavation, increase construction cost and reduce economic benefits. In order...