Інвестиційний проект реконструкції каналізаційних очисних споруд та будівництва станції виробництва біогазу у м. Львові

Abstract

This article describes the results of the technical and economic calculations and analysis of the economic efficiency of the project of reconstruction of waste water treatment plant. Lviv and construction of biogas plants for the production of electricity and thermal energy from sludge and excess activated sludge resulting from waste water treatment. The main elements of the technological scheme of biogas is methane tanks, and electrical and thermal energy – cogeneration units. Reconstruction of waste water treatment plants involves the construction of new sand sedimentation tanks, aeration system upgrades and installation aerotanks chemical waste water from nutrients – nitrogen and phosphorus. To implement the investment project will use the loans to European Bank for Reconstruction and Development and the Nordic Environment Finance Corporation, a grant from the European Partnership for Energy Efficiency and Environment and money Lviv City Council. Built financial model of the project, the basic indicators of its economic efficiency. Calculations are made using a software system “Project Expert” and “Microsoft Excel”. The investment project justifies the cost-effectiveness and feasibility of the proposed loan and grant for the reconstruction and construction of these facilities from a technical and financial point of view.

Authors and Affiliations

М. Kizyeyev, V. Osadchy, О. Osadchy

Keywords

Related Articles

Порівняльний аналіз розрахунку проектного теплового навантаження систем опалення будівель за європейською та вітчизняною методиками (на прикладі житлового будинку в м. Рівне)

The paper reflects the comparative analysis of calculation results of the design heat load of heating systems of multi-storeyed building in Rivne according to European Norms EN 12831 and Building Norms SNIP 2.04.05-91*....

THERMAL MODERNIZATION OF INDUSTRIAL ROOMS AIR CONDITIONING SYSTEM

An important priority of the economic policy of Ukraine is the careful use of energy. Therefore, a large-scale energy saving policy is being implemented in the country, and energy efficiency objectives are comprehensive...

COMPARING OF THE VOLUME OF STORMWATER RUNOFF FROM TYPICAL RESIDENTIAL CATCHMENTS IN LARGEST CITIES, CALCULATED ACCORDING TO UKRAINIAN NORMATIVE DOCUMENTS

It was analyzed Ukrainian normative documents, regulating the procedure of calculating the average annual volume of stormwater runoff from urbanized areas. It was found the big differences as in the numerical values of t...

Розрахунок за деформаційною моделлю залізобетонних колон, підсилених вуглецевою стрічкою

In this paper for calculation of reinforced concrete columns strengthened with carbon laminate with suggestions based on the method of calculation according to the recommendations NIISK and Sika on the basis of deformati...

BEARING CAPACITY OF STEEL-CONCRETE BENT ELEMENTS REINFORCED WITH ADDITIONAL UNSTRAINED ARMATURE AT DIFFERENT LEVELS OF STRAINED STATE

In this article, there are given the results of studies on the strength of steel-concrete bent elements, in which additional reinforcement was introduced at various levels of initial reinforcement and loading, as well as...

Download PDF file
  • EP ID EP230211
  • DOI -
  • Views 114
  • Downloads 0

How To Cite

М. Kizyeyev, V. Osadchy, О. Osadchy (2016). Інвестиційний проект реконструкції каналізаційних очисних споруд та будівництва станції виробництва біогазу у м. Львові. Вісник Національного університету "Львівська політехніка". Серія "Теорія та практика будівництва", 0(844), 103-112. https://europub.co.uk/articles/-A-230211