INVESTIGATING THE POTENTIALS OF FAST TRACK IN MITIGATING PROJECT ABANDONMENT: CASE STUDIES

Journal Title: Manager Journal - Year 2011, Vol 14, Issue

Abstract

The construction industry plays a very role in the fixed capital formation of any economy. Thus, the activities of construction in any economy, mirrors its general performance; a healthy economy usually experiences an upward swing in construction activities and a depressed economy indicates the reverse. But, project abandonment has been posing a threat to so many countries in their march towards the achievement of the above economic independence and greater civilization, and Nigeria is no exception. We have road and other construction projects that have taken ages in building, whose completion date is only in the imagination of the gods. Governments succeed governments and waste many months reviewing contracts and on-going projects, and re-awarding contracts. The ritual has come to stay and public funds are sunk into projects whose viability, usefulness, and urgency remain doubtful; then they are abandonment. However, majority of project abandonment could be traced to longer project duration. This is because the longer the duration of a project the more additional costs to the project through variations, inflations, and other expenses associated with time (time related to expenses). Time consumed by project directly influence the cost incurred on a project. When these traditional costs are too much, they lead to the client’s budget for the project to be exceeded. And when clients can no longer entertain those additional costs, it becomes a subject of disputes, and eventually the project is abandoned. As such, there is the need for the construction industry participants to embrace an efficient and effective means of minimizing projects’ duration in order to minimize the occurrences of project abandonment; and Fast Track procurement method is one good project management tool that have been in used to meet these challenges of time and cost.

Authors and Affiliations

Amir Hassin B. Baharuddin, Abdel Hamid Kadir Pakir, Abdelnaser Omran, Ibrahim Ado Wudil

Keywords

Related Articles

Intellectual Capital. Knowledge and Competitive Advantage in the Organizational Management

The turbulent business environment has inevitably led to an increase in competition, especially in saturated markets of products and services. The economic development of the organization will indisputably depend on the...

The Role of Knowledge, Research, Innovation and Competitiviness According to the Romanian Strategy for 2007-2013

The engine for the development of the Romanian knowledge society will be from now the Research, Development and Innovation (RDI) system. This offers the opportunities to sustain performance through innovation in all area...

The weaknesses of China\'s contractors in overseas construction project management: 2 case studies

The practices of international construction contracting have been prevalent increasingly over the past half a century. Altough the contractors of highly developed world have dominated this field, there tends to be more p...

Long-life Learning and Entrepreneurship

This study attempts to give a general view of actual condition of human resources in SMEs in Kosova, possibilities and perspectives for development of entrepreneurship core from education system in Kosova. The survey of...

IMPACT OF GLOBAL ADOPTION OF IFRS ON NIGERIAN STOCK MARKET EFFECTIVENESS

International Financial Reporting Standard (IFRS) is a statement of intent to globalize financial standards so as to enable investors move capital and as such enshrine global competitiveness. Nigeria’s case to attract in...

Download PDF file
  • EP ID EP448785
  • DOI -
  • Views 79
  • Downloads 0

How To Cite

Amir Hassin B. Baharuddin, Abdel Hamid Kadir Pakir, Abdelnaser Omran, Ibrahim Ado Wudil (2011). INVESTIGATING THE POTENTIALS OF FAST TRACK IN MITIGATING PROJECT ABANDONMENT: CASE STUDIES. Manager Journal, 14(), 123-138. https://europub.co.uk/articles/-A-448785