Investigation of Causes of Delay in High Rise Building Project and Remedial Measures Case Study-Pune

Abstract

At present, the approval processes involved in construction projects is complex all over country While undertaking construction projects like residential, commercial or industrial etc., it has been observed that obtaining clearances for the Building Projects has become cumbersome and lengthy. Overthepastdecade it has been observing that huge population enters into big cities like Pune for bread and butter, so there is tremendous demand for housing. This demand is fulfilled by developer, builder. But due to less availability of land, vertical construction is most demanding in the form of high rise buildings. But at the same time some sensitive issues like getting approvals on time and ground facts like delays in getting approvals need to be focus so customer will get its possession in time from developer and at the same time builder shall not incur losses due to delay in sanctioning of approvals as it plays magnificent role.

Authors and Affiliations

Kushal K. Panchariya, Prof. P. P. Bhangale

Keywords

Related Articles

Chronological Developments in Inventory Control Best Practices for FMCG Sector: a review paper of inventory control system

Agriculture contributes a major share in the national economy of India. A major portion of Indian economy (about 70%) depends upon agriculture as it forms the main source of livelihood and income. About 43% of India‟s ge...

Extra Geometry I. Extra lines

Using the theory of exploded numbers by the axiom – systems of real numbers and Euclidean geometry, we introduce a the concept of extra - line of the three – dimensional space. The extra - lines are the visible subsets o...

User behaviors attributes of database anomaly detection model

This paper includes the description of designing a data-base anomalydetection system, whichis capable of being more precisein depictingthe behaviors of individuals and improving data-base abnormaldetecting correctness. I...

Melanins are Biological Diamonds

In the article the physical, chemical, biological properties, the significance and the role in Nature of melanin pigments are considered. Very long time these pigments were considered as metabolism garbage in the living...

A Simple Analytical Model for Estimating Long-term Productivity of Multi-fractured Shale Gas Wells

Shale gas production has been successful developed over the past several years. The horizontal well with multistage hydraulic fracturing has proven to be an effective operation of development these unconventional reservo...

Download PDF file
  • EP ID EP391610
  • DOI 10.9790/9622-0707057277.
  • Views 135
  • Downloads 0

How To Cite

Kushal K. Panchariya, Prof. P. P. Bhangale (2017). Investigation of Causes of Delay in High Rise Building Project and Remedial Measures Case Study-Pune. International Journal of engineering Research and Applications, 7(7), 72-77. https://europub.co.uk/articles/-A-391610