JOB SHOP SCHEDULING CONSIDERING MAKESPAN, PENALTIES OF MACHINE IDLING, AND JOB OUT OF TIME

Journal Title: International journal of research -GRANTHAALAYAH - Year 2019, Vol 7, Issue 1

Abstract

In this study, the job shop scheduling problem is analysed with respect to numerous objectives, and a multi-objective model is developed to optimise the makespan, maximum job earliness, maximum job tardiness, maximum machine idle time, total machine idling penalties, total job untimed penalties, and total penalties (multi-objective) using the genetic algorithm.

Authors and Affiliations

Keywords

Related Articles

PROJECT TEAM FORMATION AND DEVELOPMENT BASED ON THE IMPOVED COMPETENCE METHOD

Creation of a project team is the first stage in the long sequence of all works which are related to the desired project. At this stage, a group of participants should be carefully chosen, based not only on their experie...

CONTRIBUTION OF WOMEN IN HYDROLOGICAL RESEARCH

Women play a central part in the provision, management and safeguarding of water. This pivotal role of women as providers and users of water and guardians of the living environment has seldom been reflected in institutio...

A SURVEY ON AUTONOMUS CAR TESTING

Amid self-governing auto framework improvement, the independent vehicles testing directions build up a Self-sufficient Vehicle Analyzer Program with sensors and control framework. In this paper, the overview of the indep...

CULTIVATION AND INGESTIBILITY OF ANGOLE PEAS (CAJANUS CAJAN) IN SAHEL GOAT IN NIGER

This study was conducted on the experimental site of the Faculty of Agriculture of Abdou Moumouni University of Niamey. Objective of the work is to study the culture of species Cajanus cajan while determining its applica...

STUDIES ON GENERALISED UNSTABLE FUNCTIONS IN TOPOLOGICAL SPACES

In this paper we bring in a new class of functions called g*Λ irresolute function and contra g*Λ irresolute function, where g*Λ irresolute function is a weaker form of g*Λ continuous function and contra g*Λ irresolute fu...

Download PDF file
  • EP ID EP447298
  • DOI 10.5281/zenodo.2550095
  • Views 87
  • Downloads 0

How To Cite

(2019). JOB SHOP SCHEDULING CONSIDERING MAKESPAN, PENALTIES OF MACHINE IDLING, AND JOB OUT OF TIME. International journal of research -GRANTHAALAYAH, 7(1), 73-82. https://europub.co.uk/articles/-A-447298