Layout and Assembly Selection Algorithm for Standard Ring+Turning Ring Shield Tunnel Segments

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 10

Abstract

Objective To address the challenges associated with the manual layout and point selection of S+T (standard rings+turning rings (double-sided wedges)) in shield tunnel segments, including high subjectivity, complex calculations, and heavy repetitive workload, a research is carried out focusing on algorithm development to resolve practical engineering issues. Method An automatic layout, assembly selection, prediction algorithm and software are developed for S+T in tunnel segments. Referring to mature construction experience, segment layout plan is calculated based on tunnel alignment and segment turning angles, and segment layout calculation automation is achieved. The calculation and decision-making methods of S+T segment types are proposed with comprehensive consideration of tunnel alignment, shield tail clearance, hydraulic cylinder stroke, and shield machine trends, enabling the automatic selection and assembly of segment points. Furthermore, by establishing a relationship between shield posture changes and variations in shield tail clearance and cylinder stroke, the algorithm can predict the S+T assembly points and segment types for the two future rings. Result & Conclusion The research results are successfully applied to Guangzhou Metro Line 12, significantly improving the efficiency of on-site S+T layout and selection, reducing labor costs, and optimizing the shield tunnel construction process.

Authors and Affiliations

Dongdong XIONG, Zhao YANG, Chao XU

Keywords

Related Articles

Turnout Design of Same-side Curved Track for Straddle Tourism Monorail

Objective The tourism rail project at a scenic area is a single-line route. To enhance tourists transportation efficiency, it is required to arrange two sets of single-opening curved track turnout symmetrically within th...

Fault Analysis and Resolution Measures for Overvoltage Chopping IGBT of Chongqing Rail Transit Line 2 Trains

[Objective] Multiple incidents of overvoltage chopping IGBT (insulated gate bipolar transistor) faults are observed during train main line operation of Chongqing Rail Transit Line 2, significantly impacting the line norm...

Automatic Turn-back Scheme for City Railway Intervals Based on CTCS2+ATO Signaling System

[Objective] When there is a malfunction or temporary operation schedule adjustment under public transit operational scenarios,the train turn-back in intervals is required for city railways using the CTCS2+ATO (Chinese...

Influence of Shield Launching and Receiving on Working Shaft Retaining Structure

[Objective] Generally, shield machines are launched or received after completing the construction of shield working shaft main structure. However, due to various constraints, considering SLR (shield launching and receivi...

Exploration and Practice of Intelligent Operation-maintenance Platform for Hang-Hai Intercity Railway Track Hospital

[Objective] Aimed at the OM (operation-maintenance) pain points and intelligent OM requirements of Hang-Hai (Hangzhou to Haining) Intercity Railway, to explore a path for intelligent OM high-quality development, the inve...

Download PDF file
  • EP ID EP749208
  • DOI 10.16037/j.1007-869x.2024.10.005
  • Views 68
  • Downloads 0

How To Cite

Dongdong XIONG, Zhao YANG, Chao XU (2024). Layout and Assembly Selection Algorithm for Standard Ring+Turning Ring Shield Tunnel Segments. Urban Mass Transit, 27(10), -. https://europub.co.uk/articles/-A-749208