Layout and Assembly Selection Algorithm for Standard Ring+Turning Ring Shield Tunnel Segments

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 10

Abstract

Objective To address the challenges associated with the manual layout and point selection of S+T (standard rings+turning rings (double-sided wedges)) in shield tunnel segments, including high subjectivity, complex calculations, and heavy repetitive workload, a research is carried out focusing on algorithm development to resolve practical engineering issues. Method An automatic layout, assembly selection, prediction algorithm and software are developed for S+T in tunnel segments. Referring to mature construction experience, segment layout plan is calculated based on tunnel alignment and segment turning angles, and segment layout calculation automation is achieved. The calculation and decision-making methods of S+T segment types are proposed with comprehensive consideration of tunnel alignment, shield tail clearance, hydraulic cylinder stroke, and shield machine trends, enabling the automatic selection and assembly of segment points. Furthermore, by establishing a relationship between shield posture changes and variations in shield tail clearance and cylinder stroke, the algorithm can predict the S+T assembly points and segment types for the two future rings. Result & Conclusion The research results are successfully applied to Guangzhou Metro Line 12, significantly improving the efficiency of on-site S+T layout and selection, reducing labor costs, and optimizing the shield tunnel construction process.

Authors and Affiliations

Dongdong XIONG, Zhao YANG, Chao XU

Keywords

Related Articles

Inbound Passenger Flow Prediction of Spatio-temporal Graph Convolutional Neural Network for Urban Rail Transit Based on Spatio-temporal Correlation

Objective Accurate short term passenger flow prediction is of great significance to improve the operation and management efficiency of the ultra-large scale of urban rail transit network. However, the current research on...

A DC Circuit Breaker Condition Evaluation Model Based on Health Indexes

[Objective] DC circuit breaker is a key equipment in metro traction power supply system. To improve the reliability of the traction and power supply system through reasonable maintenance strategy, it is necessary to eval...

Construction Settlement Monitoring and Control Measures for Mining Method Tunnel Section by Cutting Piles Closely Under-passing Existing Metro Station

Objective When the sectional tunnel closely under-passes the existing metro station by cutting piles, it has a significant impact on the deformation of the upper station. In order to ensure the safety of construction, it...

Research on Site Selection of Emergency Rescue Station in Urban Rail Transit Line Network Based on P-center Model

Objective With the expansion of urban rail transit line network, the system risks become more complicated and uncontrollable. In order to improve the emergency rescue capability of urban rail transit system, site selecti...

Sensitivity Analysis and Optimization Design of Brake System Pipeline Clamp Positions

Objective During the design phase of brake system pipeline for rail vehicles, optimizing the support positions of clamps can effectively avoid the excitation frequency of the vehicle carbody and reduce the risk of pipeli...

Download PDF file
  • EP ID EP749208
  • DOI 10.16037/j.1007-869x.2024.10.005
  • Views 30
  • Downloads 0

How To Cite

Dongdong XIONG, Zhao YANG, Chao XU (2024). Layout and Assembly Selection Algorithm for Standard Ring+Turning Ring Shield Tunnel Segments. Urban Mass Transit, 27(10), -. https://europub.co.uk/articles/-A-749208