Lean Manufacturing Implementation Using Value Stream Mapping to Eliminate Seven Waste in Painting Process

Abstract

Gas stove producers faced intense competition in the market. This condition encourages gas stove producers to increase productivity by reducing 7 (seven) waste in the production process, especially in painting process. The purpose of this study is to determine the factors that can affect the reduction of 7 (seven) waste in the production process, knowing the number of Value Added (VA) and Non Value Added (NVA) in the reduction of 7 (seven) waste. The method used to identify waste is the Value Stream Mapping, for analysis of repairs used 5W 1H tools. VSM can provide a description of the material flow, and information during the production process, starting from the arrival of raw materials from suppliers to the delivery of finished products. From the calculation, a decrease in lead time by 1098.3 seconds and a decrease in NVA of 332.3 seconds were obtained.

Authors and Affiliations

Hernadewita . , Anni Rohimah

Keywords

Related Articles

A Cost-Effective Technique to Avoid Communication and Computation Overhead in Vehicle Insurance Database for Online Record Monitoring

The study focuses on the information from heterogeneous data sources in online vehicle insurance record linkage. It resolves several types of heterogeneity problems that arise, when the same real-world entity type is rep...

CFD Simulation of Solar Loading in Car

A frequent problem faced by the car drivers in Chennai is, the hot suffocating inner of the car following hours of steady solar radiation when parked in an un-shaded area. The heat build-up in the cabin due to solar radi...

Experimental Investigation on Mechanical Properties of AISI 316l SS Weldment by Using GTAW Process

Welding is considered as one of the most important methods of metal joining process among other joing process. In this study, GTAW and Pulsed GTAW process is are used to weld AISI 316L type of Austenitic steel(3)along w...

Mathematical Modeling of Unsaturated Isophthalic Resin's Curing cycle

Fiber reinforced plastics (FRP) products are light weighing and strong. These his materials find extensive applications in various engineering fields and also as sensor metariasl. Curing of this resin is a key to obtain...

Numerical Investigations for the Effect of Cold and Hot Air on Various Parameters of Flow through A Super Sonic Nozzle at Higher Altitudes

An ejector system is to be designed in order to pump out the gasses from low pressure to ambient conditions. Ejectors mainly use the principles of fluid dynamics for pumping. They do not consist of any mechanical parts a...

Download PDF file
  • EP ID EP585616
  • DOI 10.24247/ijmperdapr201974
  • Views 76
  • Downloads 0

How To Cite

Hernadewita . , Anni Rohimah (2019). Lean Manufacturing Implementation Using Value Stream Mapping to Eliminate Seven Waste in Painting Process. International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ), 9(2), 749-758. https://europub.co.uk/articles/-A-585616