Lean Manufacturing Implementation Using Value Stream Mapping to Eliminate Seven Waste in Painting Process

Abstract

Gas stove producers faced intense competition in the market. This condition encourages gas stove producers to increase productivity by reducing 7 (seven) waste in the production process, especially in painting process. The purpose of this study is to determine the factors that can affect the reduction of 7 (seven) waste in the production process, knowing the number of Value Added (VA) and Non Value Added (NVA) in the reduction of 7 (seven) waste. The method used to identify waste is the Value Stream Mapping, for analysis of repairs used 5W 1H tools. VSM can provide a description of the material flow, and information during the production process, starting from the arrival of raw materials from suppliers to the delivery of finished products. From the calculation, a decrease in lead time by 1098.3 seconds and a decrease in NVA of 332.3 seconds were obtained.

Authors and Affiliations

Hernadewita . , Anni Rohimah

Keywords

Related Articles

Senna Alata Extract Modified Pullulan as Bio Coagulant in Water Treatment

The production of drinking water from raw water sources involves coagulant use at a coagulation/flocculation stage, to remove turbidity in the form of suspended and colloidal material. Many coagulants and flocculants are...

An Investigation of Comparative Study in Connecting Rod by using Finite Element Analysis

Most of the automobile parts are connected with the help of connecting rod. More vibration occurs on the engines. This project deals with reducing the vibration and calculates the natural frequency of the engines. The to...

Comparison of Wall Temperatures on Scramjet Inlets at Hypersonic Velocities

Skin frictions produced at high operational speeds generate lots of heat on the surface of the aircrafts. It is very much essential to determine the quantity of the heat produced on the outermost layer of the vehicle dur...

Parametric Study in Surface Finishing of Inconel 718 Surface with Magnetic Abrasive Finishing Process

Inconel 718 is a nickel based alloy, used in high pressure and temperature applications, due to its high strength and thermal resistance properties. Machining of Inconel 718 is very difficult due to its toughness. Surfac...

EXPERIMENTAL, CHARACTERIZATION AND EVALUATION OF VARIOUS COMPOSITE MATERIALS FOR AUTOMOBILE COMPONENTS

The aim of this work deals with the microstructure and the mechanical properties of silicon carbide, zirconium dioxide (SiC, ZrO2) reinforced aluminum metal matrix composite. Aluminum metal matrix composite of varying si...

Download PDF file
  • EP ID EP585616
  • DOI 10.24247/ijmperdapr201974
  • Views 61
  • Downloads 0

How To Cite

Hernadewita . , Anni Rohimah (2019). Lean Manufacturing Implementation Using Value Stream Mapping to Eliminate Seven Waste in Painting Process. International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ), 9(2), 749-758. https://europub.co.uk/articles/-A-585616