Abstract

Reliability Centered Maintenance (RCM) as one of the processes that used to decisive action which should be performed to ensure any physical components or a system can work optimally in accordance with the function desired by its users. Basically, RCM used a risk management principles of the failure of the components so that it can be determined the type of maintenance properly. With the appropriate type of maintenance, then the failures that may occur can be prevented at once to be able to be detected before they occur. Appropriate implementation of RCM, capable of delivering cost savings, the impact on both the cost of maintenance as well as repair costs due to the occurrence of failure. In this paper, the components become the object of research is the main engine of the KT. X tugboat belongs to Pelindo Marine Service (PMS) Surabaya. KT. X tugboat has the lowest level of availability of the entire company-owned tugboat 80.01 percent. Tugboat is one of the main assets of PMS who support the economy of the company. Therefore, it is imperative for a company to further enhance the efficiency of activities of its operations. These include the efficiency of human resources, as well as economic analysis of system reliability of company assets. It is used in order to keep abreast of competition at the world maritime national and globally. Implementation of RCM process on main engine KT. X, priority levels can be specified against the failure of components that have critical consequences. So it can be a planned maintenance system generated properly and efficiently.

Authors and Affiliations

Dwi Priyanta, Muhammad Badrus Zaman, Apriagung Diantana P

Keywords

Related Articles

Simulation of Double Walled Pipe Impact to Crude Oil Flow in Subsea Pipeline System

Crude oil contains mixed of hydrocarbons, the most commonly found molecules are alkanes (paraffins), cycloalkanes (naphthenes), aromatic hydrocarbons, or more complicated chemicals. In the process of taking crude oil in...

Risk Assessment in Financial Feasibility of Tanker Project Using Monte Carlo Simulation

Every ship project would not be apart from risk and uncertainty issues. The inappropriate risk assessment process would have long-term impact, such as financial loss. Thus, risk and uncertainties analysis would be a very...

Analysis of Influence of Masks Flow on Intake Valve of Gas and Oil Fuel Engine Based Simulation

Turbulent flow in the combustion chamber affects the combustion process which also affects the engine performance. The turbulent flow intensity can increase the duration of combustion, but too much turbulent turbulent fl...

Technical Overview Of Biogas Utilization as Fuel of Boat Engine

The depletion of world energy reserves and the increasing levels of environmental pollution, increase human creativity. Discoveries on environmentally friendly renewable energy-making technologies are increasingly widesp...

Slurry Ice as a Cooling System on 30 GT Fishing Vessel

Indonesia is the largest archipelago country in the world that has a sea area that is very spacious. Indonesian sea area is 5.8 million square kilometers and a coastline of 95 181 km has huge potential in the fisheries s...

Download PDF file
  • EP ID EP247662
  • DOI 10.12962/j25481479.v2i1.2704
  • Views 204
  • Downloads 0

How To Cite

Dwi Priyanta, Muhammad Badrus Zaman, Apriagung Diantana P (2017). Maintenance Task Allocation And Planning In KT. X Tugboat Using Reliability Centered Maintenance Method. International Journal of Marine Engineering Innovation and Research, 2(1), 59-69. https://europub.co.uk/articles/-A-247662