Management operation system techniques (MOST) replaces PERT and CPM in construction scheduling

Journal Title: International Journal of Modern Engineering Research (IJMER) - Year 2014, Vol 4, Issue 12

Abstract

The Management Operation System Technique (MOST) invented in 1961, replaces PERT and CPM on construction projects and in program management. Since its inception, MOST has gained popularity and is now widely used in both large and small construction projects. Its use has been equally effective on projects ranging from several thousand dollars to $193 million so far. It is a combination of several traditional and modern planning techniques like bar chart, Gantt chart, CPM and PERT. The advantages of these have been extracted and disadvantages have been eliminated. Few of the advantages are: it is very helpful for repetitive works in both real and infrastructure projects and uses backward integration which helps in knowing the ground realities very easily. It gives the project manager visibility and identifies potential trouble areas requiring management action. This paper deals with application of MOST for construction activities of a 25 Kms Road project and drawing of MOST schedules. In the end the limitations of MOST are mentioned

Authors and Affiliations

Shailla

Keywords

Related Articles

An Enhance PSO Based Approach for Solving Economical Ordered Quantity (EOQ) Problem

The Meta-heuristic approaches can provide a sufficiently good solution to an optimization problem, especially with incomplete or imperfect information and with lower computational complexity especially for nume...

 A Study on Groundnut Husk Ash (GHA)–Concrete under Acid Attack

 This paper presents the findings of an investigation on the compressive strength of Groundnut Husk Ash (GHA)-Concrete and its resistance to acid attack. The GHA used was obtained by controlled burning of groundnut...

 Structural Analysis of NAB Propeller Replaced With Composite Material

 Abstract : The present work deals with modeling and analyzing the propeller blade of a underwater vehicle for their strength. A propeller is a complex geometry which requires high end modeling software. The solid m...

Arbitration in Construction Industry: An Overview

The significant increase in the role of construction industry in the development of nations.But over the last few decades has been accompanied by a considerable increase in the number of commercial disputes as...

 Content Extraction with text mining using natural language processing for anatomy based topic summarization

 Abstract: Inorder to get exact content for the web browsers when searching for some information we have combined two methods together.The first method is text mining using natural language processing and parse tree...

Download PDF file
  • EP ID EP137333
  • DOI -
  • Views 124
  • Downloads 0

How To Cite

Shailla (2014). Management operation system techniques (MOST) replaces PERT and CPM in construction scheduling. International Journal of Modern Engineering Research (IJMER), 4(12), 8-15. https://europub.co.uk/articles/-A-137333