Managing portfolio’s risk for improving quality in a project oriented manufacture

Journal Title: International Journal of Innovation in Engineering (IJIE) - Year 2021, Vol 1, Issue 1

Abstract

Iran is a developing country and there are many different infrastructure projects in hand. Some of the manufacturers that produce equipment for infrastructure projects as for oil, gas and energy projects should manage their efforts based on production management and project management practices; these kind of manufactures are known as project oriented manufacture. It is very important to manage and control manufacturing equipment project with the consideration of the constraints (time, cost, scope and quality). During the project’s lifecycle many risks take place, either positive or negative that should be controlled not to have a negative effect on quality of the project. With considering this concept, in this paper we will discuss a framework how to manage risks to eliminate negative effects on the quality of the project.

Authors and Affiliations

Farshad Shirazi,

Keywords

Related Articles

Modeling and Solving Flow Shop Scheduling Problem Considering Worker Resource

In this paper, an uninterrupted hybrid flow scheduling problem is modeled under uncertainty conditions. Due to the uncertainty of processing time in workshops, fuzzy programming method has been used to control the parame...

Business Location and Customer Patronage in the Hotel Industry in Benue State, Nigeria

This study examined the effect of business location on customer patronage of hotels in Benue State, Nigeria: The study specifically examined the effect of parking space, road network and accessibility and security and sa...

Providing a model for the issue of multi-period ambulance location

In this study, two mathematical models have been developed for assigning emergency vehicles, namely ambulances, to geographical areas. The first model, which is based on the assignment problem, the ambulance transfer (mo...

Approach to Implementing Health and Environmental Safety System in Construction Projects Using Fuzzy Logic

The present study's objective is the implementation of the general Health and Safety Executive(HSE) Plan in civil projects; at first, it is required to formulate the Work Breakdown Structure(WBS) in the relevant project...

Financial Deepening and Economic Growth in Nigeria: Evidence from 1982 – 2019

This paper examines the impact of financial deepening on economic growth in Nigeria from 1982 – 2019. The objective of the study is to look at the impact of credit to private sector, money supply and gross domestic savin...

Download PDF file
  • EP ID EP696855
  • DOI -
  • Views 63
  • Downloads 0

How To Cite

Farshad Shirazi, (2021). Managing portfolio’s risk for improving quality in a project oriented manufacture. International Journal of Innovation in Engineering (IJIE), 1(1), -. https://europub.co.uk/articles/-A-696855