MANAGING UNCERTAINTIES VIA AN EMBEDDED FORESIGHT REGIMEN IN THE NATIONAL POLICY PLANNINGARCHITECTURE

Abstract

National policy planning can be a relatively tortuous process due to rising cross-sectoral complexities and bloated government structures. It is also becoming increasingly difficult to maintain the relevance of national policies in a rapidly-changing global environment. This paper posits that long-term policy relevance can be sustained by embedding a foresight regimen throughout the national policy planning architecture. The proposed foresight template is predicated to enable the monitoring of phases and milestones in the national policy process and thereby be continually adaptable in sync with evolving external developments and internal needs. Malaysia’s automobile industry formed a partial backdrop during the development of this concept paper.

Authors and Affiliations

Keywords

Related Articles

A SURVEY ON UWB WEARABLE ANTENNA FOR BODY AREA NETWORK APPLICATION

A body wearable antenna (BWA) is a hotly research issue for the examination. In this paper different kind of receiving antennas are displayed which are as of now accessible in writing. A BWA is a material receiving anten...

EXPERIMENTAL AND NUMERICAL STUDIES ON MULTI-BOLT DOUBLE COVER BUTT JOINTED GLASS FIBRE REINFORCED COMPOSITE LAMINATES WITH ALUMINIUM BUTT STRAPS

Numerical and experimental studies on multi-bolt double cover butt jointed glass fibre reinforced composite laminates with Aluminium butt straps (size 270 x 72 x 3/4/5 mm) subjected to a tensile load are presented. Exper...

MATHEMATICAL ANALYSIS OF UNSTEADY MHD BLOOD FLOW THROUGH PARALLEL PLATE CHANNEL WITH HEAT SOURCE

A mathematical model of flimsy blood move through parallel plate channel under the action of a connected steady transverse attractive field is proposed. The model is subjected to warm source. Expository articulations are...

OXYGEN CONCENTRATION DURING PATIENT TRANSPORTATION IN THE AMBULANCE OF THE EMS

European Resuscitation Council Guidelines for Resuscitation 2010 and Advanced Life Support Provider Course teaches that the open oxygen supply must be removed from the patient during defibrillation to the distance of min...

STRESS, TRAUMA, PSYCHOLOGICAL PROBLEMS, QUALITY OF LIFE, AND RESILIENCE OF WOMEN AS REFLECTED IN VARIOUS MOVIES AROUND THE WORLD

The aim of the study was to investigate the relationships between stressor due to restriction of women movement, traumatic events due to war, sexual abuse or domestic harassment and psychological symptoms, quality of lif...

Download PDF file
  • EP ID EP306724
  • DOI 10.5281/zenodo.1304382
  • Views 110
  • Downloads 0

How To Cite

(2018). MANAGING UNCERTAINTIES VIA AN EMBEDDED FORESIGHT REGIMEN IN THE NATIONAL POLICY PLANNINGARCHITECTURE. INTERNATIONAL JOURNAL OF ENGINEERING TECHNOLOGIES AND MANAGEMENT RESEARCH, 5(6), 1-14. https://europub.co.uk/articles/-A-306724