MATRIX-BASED PROJECT PLANNING METHODS

Journal Title: Problems of Management in the 21st Century - Year 2011, Vol 1, Issue 5

Abstract

Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, �96�; Fulkerson, �96�; Kelley & Walker, �959; PMI, ���6; Pritsker, �966), which can be widely applied to project planning fromareas as diverse as construction and R&D. However, these network planning methods are not very appropriate in cases where IT, innovation or product development are involved. There are some shortcomings when using network planning methods for scheduling these kinds of projects, because these methods cannot handle the importance of the task realizations. They cannot solve the problem, when some tasks have to be left out from the project because of the constraints, or when the completion order of tasks can be different. In this paper new matrix-based project planning methods are introduced which illustrate how all possible solutions can be determined in two steps based on the Project Expert Matrix. Firstly those tasks are selected, which have to be or can be realized during the project. Afterwards the dependencies (the sequence of the chosen tasks) are determined taking the project constraints into account. The possible solutions can be ranked and the most probable solution can be chosen which can be realized within the given constraints. This method can be a useful tool for project managers as a part of an expert system.

Authors and Affiliations

Zsolt Tibor Kosztyán, Judit Kiss

Keywords

Related Articles

THE RISKS OF CURRENT POLITICAL RISK MANAGEMENT

Political risk is a concept traditionally related, on the one hand, to the rational calculation of risk in economic activities and, on the other, to a particular historical moment in which it has taken on the characteris...

KNOWLEDGE LIFE CYCLE AND ITS APPLICATION IN AUTOMOTIVE INDUSTRY

Knowledge management (KM) is attracting considerable attention as many organizations realize that they compete in a knowledge economy. Therefore, a key source of sustainable competitive advantage relies on managing kno...

PERFORMANCE MEASUREMENT SYSTEMS IN THE CONTEXT OF NEW PUBLIC MANAGEMENT: EVIDENCE FROM AUSTRALIAN PUBLIC SECTOR AND POLICY IMPLICATIONS FOR DEVELOPING COUNTRIES

This research explored in depth the evolution of performance measurement systems in the context of new public management initiatives in Australian public sector. A governmental department in the Australian Capital Terr...

METHODOLOGY FOR DESIGNING AN EDUCATIONAL SUBSYSTEM AS A POLL FROM THE HOUSE OF QUALITY IN MACEDONIAN COMPANIES

The education of the employees in each instance of a company comes along with a purpose to gain competence and experience in order to realize every business process according to the demands of the products/services, th...

NON-FORMAL MANAGEMENT EDUCATION: SOME EVIDENCE FROM MANAGEMENT TRAINING BUSINESSES WEBSITES IN ESTONIA

Management education and MBA programs have been criticized for being rigor and having little effect on managerial performance, however little attention has been paid to management education provided by management train...

Download PDF file
  • EP ID EP32092
  • DOI -
  • Views 355
  • Downloads 1

How To Cite

Zsolt Tibor Kosztyán, Judit Kiss (2011). MATRIX-BASED PROJECT PLANNING METHODS. Problems of Management in the 21st Century, 1(5), -. https://europub.co.uk/articles/-A-32092