Measurement of Standard Time Work with the Predetermined Motion Time System Method at the Production Department in PT.PIJ Sidoarjo
Journal Title: Engineering and Technology Quarterly Reviews - Year 2019, Vol 2, Issue 2
Abstract
The purpose of this study is to measure standard work time in the production section at “PT. Prestasi Ide Jaya” (PT.PIJ) where there are several workers and machine operators, if between one of the operators on each machine does not work properly it will cause the production process to stop. In this study there are two variables, namely 1) the dependent variable is the time and movement of the machine operator, 2) the independent variable of several Therblig movements: a. reach out, b. take off, c. holding, d. direct, and e. transport. Measuring the standard time of operator movements with Work Factor and Time Measurement Methods. The calculation results can be concluded that the Time Measurement (MTM) and Work factor (WF) methods can provide a standard time that is following the standard time that is smaller than real conditions. Company is proposing to reduce operator movements that are not needed in the production process.
Authors and Affiliations
Wiwik Sumarni
Effect of Height on Retrofitting of Existing Steel Frames Using Buckling Restrained Brace Frames
Recent earthquakes indicate the importance of retrofitting existing structures to achieve an acceptable level of performance. Several different methods for retrofitting of existing structures were used by structural desi...
The Effect of Time, Price of Stock Research and Development, and Number of Bugs on Net Revenue for Intel Corporation
Intel Corporation studied the effect of bugs in the revenue of the company. In this paper, we look at the factors affecting the revenue of Intel Corporation with respect to how bugs affect the revenue. By doing research...
Rainwater Harvesting for Drinking Water in Bali, Indonesia
The water source on the island of Bali, Indonesia, tends to be uneven and depends on geographical and climatological factors. In the remote area at Kubu Subdistrict, Karangasem Regency experiences with very limited water...
Oxidative Clearing of Polyester Cotton Blended Fabric by Hydrogen Peroxide: An Alternative to Reduction Clearing
Reduction clearing is commonly carried out as an after-treatment to remove deposits of disperse dye and other residual impurities from the surface of dyed polyester. Because of certain environmental and economical disadv...
Measurement of Standard Time Work with the Predetermined Motion Time System Method at the Production Department in PT.PIJ Sidoarjo
The purpose of this study is to measure standard work time in the production section at “PT. Prestasi Ide Jaya” (PT.PIJ) where there are several workers and machine operators, if between one of the operators on each mach...