Mechanical Behavior of Urban Rail Transit Station Structure Based on Existing Shield Tunnel Interval Underground Excavation Construction
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8
Abstract
Objective Cancer Hospital Station on Shenzhen Rail Transit Line 14 adopts a scheme of large-diameter (8.5 m) shield tunnel expansion featuring tunnel-first and station-later. During the connection of the main station structure and auxiliary entrances in underground excavation, the construction of large local openings in tunnel lining is required. To ensure the structural safety during tunnel opening construction, it is necessary to study the mechanical behavior of urban rail transit station structure based on existing shield tunnel interval underground excavation. Method To simulate the station underground excavation process under various working conditions, a multi-ring shell-rigid beam-contact lining calculation model considering the effects of lining structure circumferential and longitudinal joints is adopted. The scenarios include full-opening lining ring control condition (opening condition) and half-opening lining ring control condition (support removal condition). Key design parameters, such as the position of capping block, the forms of internal support, and the dimension of tunnel longitudinal opening, are analyzed for their impact on station structure. Result & Conclusion Based on the stress characteristics of ring beams, it is recommended to use steel or embedded steel components for the upper and lower ring beams in the design. It is recommended that the arrangement of through-joint assembled segments in the opening area should be adopted according to segment stress characteristics, and the capping block of tunnel opening section through-joint assembled segments be designed at the tunnel top for Cancer Hospital Station. The bending moment distribution of opening lining ring segments throughout construction process is closely related to the effective constraint points of internal supports, and the premise of internal supports forming effective constraint is a complete axial force transmission path. The integrity of opening lining ring structure is contingent upon the lateral constraints of circumferential joints during the local tunnel opening construction.
Authors and Affiliations
Zhongan ZHANG, Ye PAN, Zhenkun GUO, Jiaolong ZHANG, Yimin GAO, Xian LIU
Application of Distributed Photovoltaic Power Generation at Urban Rail Transit Station Entrances and Exits
Objective Based on the goals of carbon peak and carbon neutrality in China and the demand for green, low-carbon and sustainable development of urban rail transit, the feasibility of applying distributed photovoltaic powe...
Degraded Operation Train Positioning and Protection Scheme Based on Beacons
Objective When the on-board signaling equipment fails, relying on trackside secondary positioning equipment for degraded operational train positioning and protection requires additional trackside signaling equipment, inc...
Thoughts on Coordination and Minimization of Urban Rail Transit Systems
[Objective] Current urban rail transit system faces issues such as information silos and low coordination efficiency, which hinder the ability to meet the demands for digital transformation, high safety, and high autom...
Structural Design of Obstacle Deflector on Type-A City Rail Transit Train
[Objective] European standard EN 15227:2020 stipulates that except the obstacle-clearing capabilities, OD (obstacle deflector) should also have energy absorption functions, specifying the energy absorption values requi...
Research on Vibration Transmission Characteristics of Subway Vehicles Based on Vibration Transmissibility
[Objective] To ensure that the vibration level of subway vehicles meets design standards during operation, it is necessary to evaluate the vibration isolation performance of subway vehicles using the vibration transmis...