Minimizing Reworks, Rejection Rate and Time Waste in a Textile Industry Using Sixsigma Tools

Journal Title: Scholars Journal of Engineering and Technology - Year 2017, Vol 5, Issue 2

Abstract

The main aim of this project is to minimize the occurrences of rework, higher rejection rate and eliminate time waste in a textile industry using sixsigma tools and techniques. As a result of this project reduction in standard minute value (SMV) is obtained, labor productivity is improved last but not least a considerable improvement in production rate and inline efficiency is achieved. To achieve this target sixsigma tools such as SIPOC diagram, Pareto analysis, brainstorming and fishbone diagram are used. Keywords: rejection rate, sixsigma, standard minute value (SMV), brainstorming, fishbone diagram.

Authors and Affiliations

Bharath S, Arvind V, Prashanth AS

Keywords

Related Articles

Classification of All Single Travelling Wave Atom Solutions to the (2 +1)-Dimensional Nonlinear KdV System

By the polynomial complete discrimination system, we give the classification of all single travelling wave atom solutions to the (2 +1)-dimensional nonlinear KdV system. Keywords: travelling wave solution; complete discr...

Experimental Investigation of Friction Stir Welding of Aluminium Alloys Using Response Surface Methodology

Abstract: Friction stir welding (FSW) uses a non-consumable tool to produce frictional heat in the adjoining surfaces. The welding parameters like rotational speed, welding speed, tool pin length, and tool shoulder diame...

Enhancement of Efficiency of TiO2|Dye|CuI Solar Cell by Coupling Two Metal-Centered Dyes

The coupling effect of cis-bis(isothiocyanato)-bis(2,2’-bipyridyl-4,4’-dicarboxylato) ruthenium(II) with triscarboxy-rutheniumterpyridine [Ru(4,4',4"-(COOH)3-terpy) (NCS)3] on the sensitization process of solid-state TiO...

Optimization and Evaluation of Foam Flooding Formula after Polymer Flooding

Aiming at the problems of vertical and lateral uneven production of the oil reservoir and further tapping the remaining oil after polymer flooding, in the paper, the foam flooding feasibility after polymer flooding is st...

Optimal Cost Planning of a Photovoltaic-Battery-Diesel Generator Hybrid Power System in Kahramanmaras Conditions

Mountain houses prevail in Mediterranean region. Electricity costs are considerably high for these houses when they are located remotely from electric network. The development of photovoltaic (PV) solar cells has become...

Download PDF file
  • EP ID EP385483
  • DOI -
  • Views 100
  • Downloads 0

How To Cite

Bharath S, Arvind V, Prashanth AS (2017). Minimizing Reworks, Rejection Rate and Time Waste in a Textile Industry Using Sixsigma Tools. Scholars Journal of Engineering and Technology, 5(2), 70-75. https://europub.co.uk/articles/-A-385483